BLD-Aging Inspection | 12/3/2008 | 12/3/2008 | 12/3/2008 | | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 12/3/2008 | 12/3/2008 | 12/3/2008 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 8/15/2008 | 8/15/2008 | 8/15/2008 | P | PASS |
Dave Hannah
|
|
|
randy Phone #: ###-#### ok for perm occ
|
BLD-Aging Inspection | 8/14/2008 | 8/14/2008 | 8/15/2008 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 2/1/2008 | 2/1/2008 | 2/4/2008 | P | PASS |
Forrest France
|
|
|
Okay for final.
|
BLD-Aging Inspection | 1/29/2008 | 1/29/2008 | 2/1/2008 | | DEFR |
Dave Hannah
|
|
|
sent to fire
|
BLD-Aging Inspection | 10/10/2007 | 10/10/2007 | 10/15/2007 | | DEFR |
Dave Hannah
|
|
|
|
BLD-Final | 4/11/2006 | 4/12/2006 | 4/17/2006 | A | DONE |
Forrest France
|
|
|
wip, pending alarm and sprinkler permit finals.
|
BLD-Final | 5/19/2005 | 5/20/2005 | 5/23/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/19/2005 at 12:14:56 PM. Contact: ###-####. ok to occ ground level
|
FIRE-Alarm Testing | 5/19/2005 | 5/20/2005 | 5/20/2005 | A | CANC |
Forrest France
|
|
|
Cancel per. Dave, the general contractor. Duplicate inspection.
|
FIRE-Final Inspection | 5/19/2005 | 5/20/2005 | 5/20/2005 | A | FAIL |
Forrest France
|
|
|
Fail inspection due to several issues, all of which are indicated on the correction notice. Some items are; install fire ext. in basement and 2nd floors, provide suite address, verify door hardware not yet installed, provide approved hardware on teller d
|
FIRE-Final Inspection | 4/22/2005 | 4/22/2005 | 4/22/2005 | P | PART |
Troy Cobbley
|
|
|
Temp occupancy is ok for the second floor tenant area only. Area just south of the new lobby is unfinished. Door security items are in the process of being added to two doors. Their operation will need to be verified prior to finaling. Emergency lighting
|
FIRE-Final Inspection | 4/22/2005 | 4/22/2005 | 4/22/2005 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given for the second floor. The fire alarm system passed in the finished areas. The area to the south of the new lobby is unfinished and will require a separate FIR permit if not finished by the time the building is finaled
|
BLD-Final | 4/22/2005 | 4/22/2005 | 4/22/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/21/2005 at 11:44:24 AM. Contact: ###-####. ok to occ the second floor 4/22/2005 1:59:58 PM
|
BLD-Final | 4/21/2005 | 4/22/2005 | 4/22/2005 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/21/2005 at 11:44:24 AM. Contact: ###-####.
|
BLD-Other | 4/19/2005 | 4/19/2005 | 4/19/2005 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/19/2005 at 9:05:26 AM. Contact: ###-####.
|
BLD-Other | 4/11/2005 | 4/11/2005 | 4/11/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/11/2005 at 7:38:42 AM. Contact: ###-####.ceiling grid ok to cover 4/11/2005 2:58:49 PM
|
BLD-Framing/Rough-in | 4/8/2005 | 4/8/2005 | 4/8/2005 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/8/2005 at 9:08:10 AM. Contact: ###-####. ceiling grid prim wires not 1 in 6 4/8/2005 1:21:30 PM
|
BLD-Other | 4/1/2005 | 4/1/2005 | 4/1/2005 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/1/2005 at 8:13:01 AM. Contact: ###-####. ceiling grid ok 4/1/2005 1:19:31 PM
|
FIRE-Conference | 3/1/2005 | 3/1/2005 | 3/1/2005 | P | DONE |
Troy Cobbley
|
|
|
For temporary occupancy for the 6th floor I need a letter stating full functionability of the emergency lighting system, two emergency lights added on the sixth floor, signage in the stairs, a barrier at ground level landing to keep people from continuing to the basement, fire extinguisher for the first floor main lobby and sprinkler protection in the mechanical closet on the first floor.
|
BLD-Conference | 2/17/2005 | 2/18/2005 | 2/18/2005 | A | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/17/2005 at 4:01:22 PM. Contact: ###-####.
|
BLD-Conference | 2/16/2005 | 2/16/2005 | 2/16/2005 | P | DONE |
Troy James
|
|
|
contractor wanted to know if they need to protect existing steel beams at third level roof assembly. I talked to Carl and he said that the existing beams need to be protected. I informed Dave with Kincaid that he needs to protect the beams. 2/16/2005 3:06:13 PM 2/16/2005 3:06:45 PM
|
BLD-Framing/Rough-in | 2/15/2005 | 2/16/2005 | 2/16/2005 | A | PART |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 2/15/2005 at 4:17:50 PM. Contact: ###-####. ok to cover walls only at first floor teller area and second level framing if all trades have approved cover. Need bracing at existing office area walls. 2/16/2005 10:20:33 AM 2/16/2005 10:22:07 AM
|
BLD-Aging Inspection | 12/21/2004 | 12/21/2004 | 12/21/2004 | | PASS |
Dave Hannah
|
|
|
work in progress 12/21/2004 9:33:48 AM
|