Permit Information
Permit NumberBLD04-01896
StatusFinaled
Name BLEDSOE CONSTRUCTION
Site Address 2990 S WISE WAY
Project NameBLEDSOE GROUP
Customer Number 
ePlanReviewNo
Description
(BLEDSOE GROUP-PRODUCTION BLDG) To remodel a 1,212 sq.ft. of an office area in an existing 18,768 sq.ft. building which fabricates cabinets for new owner/tenant per approved plans and CAA04-00134. Work includes construction of two new accessible restrooms, installation of a suspended ceiling system, construction of interior noncombustible partitions, new lighting and bi-level switching, installation of three new exterior exit doors from the production area. Note: This building was constructed in Ada County in 1973 and annexed into Boise City on June 30, 1998. (pc#531-04) Rmh / (9-29-04 PLAN MODIFICATION) THIS PLAN HAS BEEN MODIFIED PER PLAN SHEET A2.1 DATED SEPT 27TH 2004. THE RESTROOM IS BEING EXPANDED AND TWO ADDITIONAL URINALS HAVE BEEN ADDED IN THE OFFICE AREA. /RMH
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/24/20055/25/20055/25/2005APASS
DetailsDave Hannah
harry; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok for perm occ
Permanent Occupancy 5/25/20055/25/2005 DONE
Details
FIRE-Final Inspection5/23/20055/24/20055/24/2005APASS
DetailsForrest France
Fire life safety finaled.
BLD-Final4/18/20054/19/20054/19/2005PPART
DetailsTroy James
Scheduled by a contractor via Hello! on 4/18/2005 at 3:35:02 PM. Contact: ###-####. need fire approval 4/19/2005 1:44:15 PM
BLD-Final4/19/20054/19/20054/19/2005APART
DetailsForrest France
Temp. occupancy given per. Dave Lokker, pending fire alarm and fire sprinkler modifications.
FIRE-Alarm Testing4/19/20054/19/20054/19/2005APART
DetailsForrest France
Temp. occupancy given per. Dave Lokker, pending fire alarm modifications to include addition of three tamper switches and one flow switch addressed to 2990 Wise Way.
FIRE-Final Inspection4/19/20054/19/20054/19/2005APART
DetailsForrest France
Temp. occupancy given per. Dave Lokker, pending fire sprinkler modifications in spray booth and compressor room.
BLD-Conference3/15/20053/16/20053/16/2005ACANC
DetailsTroy James
Steven; Phone #: ###-#### Internet Inspection Request from: Jan Rice
FIRE-Final Inspection3/16/20053/16/20053/16/2005PFAIL
DetailsTroy Cobbley
Need to complete items 2, 3 and 4 on the correction notice. This includes fire alarm and fire sprinkler permits. Also need approved door hardware on doors in the office and repair the emergency light in the office corridor. 3/16/2005 4:52:14 PM
BLD-Final3/9/20053/10/20053/10/2005AFAIL
DetailsTroy James
Scheduled by a contractor via Hello! on 3/9/2005 at 9:53:47 AM. Contact: ###-####. need fire life and electrical final approval 3/10/2005 10:23:37 AM
FIRE-Final Inspection3/9/20053/10/20053/9/2005ACANC
DetailsTroy James
Scheduled by a contractor via Hello! on 3/9/2005 at 9:45:18 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Mar 9 2005 9:50AM.
FIRE-Final Inspection3/9/20053/9/20053/9/2005PFAIL
DetailsTroy Cobbley
See correction notice for items remaining. They include fire alarm and fire sprinkler permits for work to be done. 3/9/2005 12:39:26 PM
BLD-Final1/3/20051/3/20051/3/2005PFAIL
DetailsTroy James
steve; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
need all trades signed off final 1/3/2005 3:03:13 PM
BLD-Framing/Rough-in12/20/200412/21/200412/21/2004ACANC
DetailsDave Hannah
ceiling grid inspection please///steven; Phone #: ###-#### Internet Inspection Request from: Barbara Moore out of time 12/21/2004 11:54:58 AM
BLD-Framing/Rough-in12/21/200412/21/200412/21/2004PPART
DetailsDave Hannah
ceiling grid inspection please///steven; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
FIRE-Conference11/19/200411/19/200411/19/2004APART
DetailsRick Jackson
Met with owner after meeting with Sam Rogers - the paint booth shall comply with IFC 1504, the PIV and anti-freeze comtrol valves aren't supervised and a flow switch shall be installed on riser and monitored at FACP in Shakespeare as the fire pump is monitored at this panel, sprinkler plans needed for addition of heads under overhead doors and to replace heads near unit heaters, remove deadbolts at man doors in shop area, need extinguishers, sprinkler system requires annual inspection, left correction notice on front window 11/19/2004 11:09:16 AM
BLD-Framing/Rough-in11/2/200411/3/200411/3/2004APART
DetailsTroy James
steve cole ###-#### for cover inspection please
ok to cover walls, need to have ceiling engineered at restroom in wharehouse for 30 gallon water heater. 11/3/2004 9:34:19 AM
BLD-Framing/Rough-in10/18/200410/18/200410/18/2004PCANC
DetailsTroy James
steven ###-#### Not ready need trades rough approval. 10/18/2004 1:33:11 PM
BLD-Framing/Rough-in10/18/200410/18/200410/18/2004PCANC
DetailsTroy James
steven ###-#### Not ready need trades rough approval. 10/18/2004 1:33:11 PM
BLD-Framing/Rough-in10/18/200410/18/200410/18/2004PCANC
DetailsTroy James
steven ###-#### Not ready need trades rough approval. 10/18/2004 1:33:11 PM