BLD-Final | 9/13/2005 | 9/14/2005 | 9/14/2005 | A | PASS |
Jim Storey
|
|
|
bill ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie final ok
|
FIRE-Final Inspection | 9/12/2005 | 9/13/2005 | 9/13/2005 | A | PASS |
Forrest France
|
|
|
ADA hardware at the previously noted locations has been installed, fire life safety finaled.
|
Permanent Occupancy | | 9/12/2005 | 9/12/2005 | | DONE |
|
|
|
|
FIRE-Final Inspection | 9/7/2005 | 9/8/2005 | 9/8/2005 | A | PART |
Forrest France
|
|
|
All fire life safety issues are satisfactory except for two doors, one at the mechanical room and one at an exterior storage room, which have non ADA approved hardware. Per Ken the GC the parts are on order and an inspection will be called in when installed, a temporary occupancy has been approved.
|
BLD-Final | 9/1/2005 | 9/2/2005 | 9/2/2005 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 9/1/2005 at 3:29:07 PM. Contact: ###-####.temp ok final pending fire.
|
Code Occupancy Approval | 9/1/2005 | 9/1/2005 | 9/2/2005 | P | PASS |
Dena Gambrel
|
|
|
|
FIRE-Final Inspection | 9/1/2005 | 9/2/2005 | 9/2/2005 | A | PART |
Forrest France
|
|
|
Temporary occupancy approved with Sam Rogers permission pending completion of permanent dual phone lines for final of fire alarm permit. Life safety approved when fire alarm, door hardware, emergency light, and one exit sign are repaired as discussed.
|
FIRE-Final Inspection | 8/31/2005 | 9/1/2005 | 9/1/2005 | A | FAIL |
Forrest France
|
|
|
Emergency lighting and exit signs in some locations failed to operate, provide building address at Surprise Way, provide covers and keys for knox boxes, install missing door hardware.
|
BLD-Final | 8/31/2005 | 8/31/2005 | 8/31/2005 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 8/31/2005 at 11:14:24 AM. Contact: ###-####. fire stop wall behind stage right/adjudest fire doors w/cordenators/instal ada sink pootection/missing two panic bars at exits of chapal// recieved si ok
|
BLD-Framing/Rough-in | 8/22/2005 | 8/23/2005 | 8/23/2005 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 8/22/2005 at 3:52:09 PM. Contact: ###-####.
|
FIRE-Conference | 8/11/2005 | 8/11/2005 | 8/11/2005 | P | DONE |
Troy Cobbley
|
|
|
I marked up sheet C1.0 on the approved drawings in red for the curbing that needs to be painted to show the fire dept access routes.
|
BLD-Energy code compliance | 7/8/2005 | 7/11/2005 | 7/11/2005 | A | PASS |
Jim Storey
|
|
|
kim scags; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Framing/Rough-in | 7/1/2005 | 7/5/2005 | 7/5/2005 | A | PASS |
Jim Storey
|
|
|
ken; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa sanchuary soffit framing ok
|
BLD-Energy code compliance | 6/24/2005 | 6/27/2005 | 6/27/2005 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/24/2005 at 1:06:17 PM. Contact: ###-####.c/n rfi not all areas are fured out to meet ec have arch address configuration on plan to complet envolpe.
|
BLD-Framing/Rough-in | 6/9/2005 | 6/10/2005 | 6/10/2005 | A | PASS |
Jim Storey
|
|
|
ken; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa kitchen ceilling ok/ storage floor and behind stage framing ok.
|
BLD-Framing/Rough-in | 5/25/2005 | 5/25/2005 | 5/25/2005 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 5/25/2005 at 10:44:05 AM. Contact: ###-####.hard ciellings in wing b ok for cover.
|
BLD-Framing/Rough-in | 5/14/2005 | 5/16/2005 | 5/16/2005 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 5/14/2005 at 9:00:03 AM. Contact: ###-####.over build at sancawary ok
|
BLD-Framing/Rough-in | 4/27/2005 | 4/28/2005 | 4/28/2005 | A | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 4/27/2005 at 2:43:37 PM. Contact: ###-####.
|
BLD-Energy code compliance | 4/26/2005 | 4/27/2005 | 4/27/2005 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 4/26/2005 at 5:03:35 PM. Contact: ###-####. all gyp walls ok area b
|
BLD-Framing/Rough-in | 4/22/2005 | 4/25/2005 | 4/25/2005 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 4/22/2005 at 3:29:47 PM. Contact: ###-####.east side of area b ok for interior framing.
|
BLD-Foundation | 12/20/2004 | 12/20/2004 | 12/20/2004 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/20/2004 at 8:23:01 AM. Contact: ###-####. placed w/si 12/20/2004 4:12:25 PM
|
BLD-Foundation | 12/16/2004 | 12/17/2004 | 12/17/2004 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/16/2004 at 3:48:03 PM. Contact: ###-####.pwsi. 12/17/2004 3:59:13 PM
|
BLD-Foundation | 12/15/2004 | 12/16/2004 | 12/16/2004 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/15/2004 at 12:48:58 PM. Contact: ###-####. wip/psi 12/16/2004 10:00:29 AM
|
BLD-Footing | 12/13/2004 | 12/14/2004 | 12/14/2004 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/13/2004 at 9:00:09 AM. Contact: ###-####. ft on b ufer in place wip si pending. 12/14/2004 10:52:01 AM
|
BLD-Foundation | 12/8/2004 | 12/9/2004 | 12/9/2004 | P | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 12/8/2004 at 12:52:46 PM. Contact: ###-####.
MTI to provide special inspection/ take cylinder samples. 12/9/2004 3:48:22 PM
|
BLD-Foundation | 12/7/2004 | 12/8/2004 | 12/8/2004 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/7/2004 at 11:39:40 AM. Contact: ###-####.
|
BLD-Footing | 12/3/2004 | 12/6/2004 | 12/6/2004 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/3/2004 at 9:25:08 AM. Contact: ###-####.
|
BLD-Footing | 12/2/2004 | 12/3/2004 | 12/3/2004 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/2/2004 at 2:50:27 PM. Contact: ###-####.
|
BLD-Footing | 12/1/2004 | 12/2/2004 | 12/2/2004 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/1/2004 at 12:30:16 PM. Contact: ###-####. crew is still working on placing rebar crew using cold weather protection MTI will be onsite to do rebar inspection and test concrete 12/2/2004 2:08:16 PM
|
BLD-Footing | 11/30/2004 | 12/1/2004 | 12/1/2004 | P | CANC |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 11/30/2004 at 3:05:59 PM. Contact: ###-####.
contractor not ready. MTI to be on site for insp. 12/1/2004 4:14:43 PM
|
BLD-Footing | 11/29/2004 | 11/30/2004 | 11/30/2004 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/29/2004 at 3:17:05 PM. Contact: ###-####.mti pending report. 11/30/2004 4:43:28 PM
|
BLD-Footing | 11/29/2004 | 11/30/2004 | 11/30/2004 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/29/2004 at 3:17:05 PM. Contact: ###-####. placed with mti pending report. 11/30/2004 4:41:15 PM
|
BLD-Footing | 11/23/2004 | 11/24/2004 | 11/24/2004 | P | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 11/23/2004 at 12:40:45 PM. Contact: ###-####.
partial footings ok. (see markings on plans)
MTI to provide reports. 11/24/2004 4:14:42 PM
|
BLD-Foundation | 10/23/2004 | 10/25/2004 | 10/25/2004 | A | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/23/2004 at 10:03:59 AM. Contact: ###-####.
|