Permanent Occupancy | | 2/16/2005 | 2/16/2005 | | DONE |
|
|
|
|
BLD-Final | 11/16/2004 | 11/17/2004 | 11/17/2004 | P | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 11/16/2004 at 1:10:14 PM. Contact: ###-####.
temp c of o ok. still need electrical inspector approval for permanent c of o to be issued.
Everything pertaining to structural approval is ok.
received final approval letters from engineer of record, and special insp. firm. 11/17/2004 3:34:18 PM
|
FIRE-Alarm Testing | 11/16/2004 | 11/17/2004 | 11/17/2004 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety, fire alarm and fire sprinkler finaled 11/17/2004 9:16:36 AM
|
BLD-Final | 11/15/2004 | 11/16/2004 | 11/16/2004 | A | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/15/2004 at 12:14:37 PM. Contact: ###-####.
|
FIRE-Alarm Testing | 11/15/2004 | 11/16/2004 | 11/16/2004 | A | FAIL |
Troy Cobbley
|
|
|
Repair two emergency lights and final fire alarm 11/16/2004 10:09:26 AM
|
FIRE-Final Inspection | 11/15/2004 | 11/16/2004 | 11/16/2004 | A | FAIL |
Troy Cobbley
|
|
|
Repair two emergency lights and final fire alarm 11/16/2004 10:09:18 AM
|
BLD-Final | 11/12/2004 | 11/15/2004 | 11/15/2004 | P | CANC |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 11/12/2004 at 1:58:26 PM. Contact: ###-####.
|
FIRE-Final Inspection | 11/12/2004 | 11/15/2004 | 11/15/2004 | A | CANC |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 11/12/2004 at 1:57:52 PM. Contact: ###-####.
|
BLD-Wall cover | 11/3/2004 | 11/3/2004 | 11/3/2004 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/3/2004 at 9:44:34 AM. Contact: ###-####.
|
BLD-Conference | 10/12/2004 | 10/12/2004 | 10/12/2004 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/12/2004 at 8:25:37 AM. Contact: ###-####. Do grid ceiling per appr plan Old way) 10/12/2004 5:08:34 PM
|
BLD-Wall cover | 9/30/2004 | 10/1/2004 | 10/1/2004 | A | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 9/30/2004 at 11:00:32 AM. Contact: ###-####.
bathrooms framing ok 10/1/2004 9:50:25 AM
|
BLD-Framing/Rough-in | 9/24/2004 | 9/27/2004 | 9/27/2004 | P | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 9/24/2004 at 3:10:50 PM. Contact: ###-####.
inter. partition wall framing other than bathrooms ok.R 9/27/2004 2:15:16 PM check! 9/27/2004 2:15:48 PM
|