Permit Information
Permit NumberBLD04-01918
StatusFinaled
Name N O A A
Site Address 10095 W EMERALD ST
Project NameEmerald Tech Center-Bldg #10
Customer Number 
ePlanReviewNo
Description
(N.O.A.A. - EMERALD TECH CENTER - BLDG #10) This building is fire sprinklered. To construct a 10,752 square foot office tenant space located within an existing 10,944 square foot building. The building shell was constructed under permit BLD04-00871. Work is to include interior nonbearing walls, 2 restrooms accessible to the disabled, interior doors, suspended ceilings, and finishes all per the approved drawings and the plan review report on file. The fire sprinkler system shall comply with NFPA 13-2002 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 2/16/20052/16/2005 DONE
Details
BLD-Final11/16/200411/17/200411/17/2004PPART
DetailsLane Manuel
Scheduled by a contractor via Hello! on 11/16/2004 at 1:10:14 PM. Contact: ###-####.
temp c of o ok. still need electrical inspector approval for permanent c of o to be issued.
Everything pertaining to structural approval is ok.
received final approval letters from engineer of record, and special insp. firm. 11/17/2004 3:34:18 PM
FIRE-Alarm Testing11/16/200411/17/200411/17/2004APASS
DetailsTroy Cobbley
Fire life safety, fire alarm and fire sprinkler finaled 11/17/2004 9:16:36 AM
BLD-Final11/15/200411/16/200411/16/2004ACANC
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/15/2004 at 12:14:37 PM. Contact: ###-####.
FIRE-Alarm Testing11/15/200411/16/200411/16/2004AFAIL
DetailsTroy Cobbley
Repair two emergency lights and final fire alarm 11/16/2004 10:09:26 AM
FIRE-Final Inspection11/15/200411/16/200411/16/2004AFAIL
DetailsTroy Cobbley
Repair two emergency lights and final fire alarm 11/16/2004 10:09:18 AM
BLD-Final11/12/200411/15/200411/15/2004PCANC
DetailsLane Manuel
Scheduled by a contractor via Hello! on 11/12/2004 at 1:58:26 PM. Contact: ###-####.
FIRE-Final Inspection11/12/200411/15/200411/15/2004ACANC
DetailsTroy Cobbley
Scheduled by a contractor via Hello! on 11/12/2004 at 1:57:52 PM. Contact: ###-####.
BLD-Wall cover11/3/200411/3/200411/3/2004PCANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 11/3/2004 at 9:44:34 AM. Contact: ###-####.
BLD-Conference10/12/200410/12/200410/12/2004PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/12/2004 at 8:25:37 AM. Contact: ###-####. Do grid ceiling per appr plan Old way) 10/12/2004 5:08:34 PM
BLD-Wall cover9/30/200410/1/200410/1/2004APART
DetailsLane Manuel
Scheduled by a contractor via Hello! on 9/30/2004 at 11:00:32 AM. Contact: ###-####.
bathrooms framing ok 10/1/2004 9:50:25 AM
BLD-Framing/Rough-in9/24/20049/27/20049/27/2004PPART
DetailsLane Manuel
Scheduled by a contractor via Hello! on 9/24/2004 at 3:10:50 PM. Contact: ###-####.
inter. partition wall framing other than bathrooms ok.R 9/27/2004 2:15:16 PM check! 9/27/2004 2:15:48 PM