BLD-Final | 3/4/2005 | 3/7/2005 | 3/7/2005 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/4/2005 at 3:16:19 PM. Contact: ###-####. OK for Perm Occ. :) 3/7/2005 10:39:58 AM
|
Permanent Occupancy | | 3/7/2005 | 3/7/2005 | | DONE |
|
|
|
|
BLD-Final | 3/2/2005 | 3/3/2005 | 3/3/2005 | P | NH |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/2/2005 at 10:06:36 AM. Contact: ###-#### call before you go out so he can meet you. Called contractor....He did not return call today. 3/3/2005 5:18:59 PM
|
BLD-Final | 3/1/2005 | 3/2/2005 | 3/2/2005 | P | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/1/2005 at 1:08:06 PM. Disp set to [CANC] by a contractor via Hello! on Mar 2 2005 10:04AM.
|
BLD-Final | 12/14/2004 | 12/15/2004 | 12/15/2004 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/14/2004 at 12:29:35 PM. Contact: ###-####. ok for temp occ needs ada signs at restrooms and a letter from mti signing off spec inspection work 12/15/2004 12:49:41 PM
|
FIRE-Final Inspection | 12/14/2004 | 12/15/2004 | 12/15/2004 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled 12/15/2004 9:55:31 AM
|
BLD-Final | 12/10/2004 | 12/14/2004 | 12/14/2004 | A | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/10/2004 at 3:57:50 PM. Contact: ###-####. Need fire approval. 12/14/2004 11:05:05 AM
|
FIRE-Final Inspection | 12/10/2004 | 12/13/2004 | 12/13/2004 | P | FAIL |
Troy Cobbley
|
|
|
New overhead door in existing storage room obstructs upright sprinkler heads, provide one more fire extinguisher near the storage room entrance, provide approved door hardware on the restrooms and remove thumbturns at the main exits 12/13/2004 4:21:47 PM
|
BLD-Final | 12/8/2004 | 12/10/2004 | 12/10/2004 | A | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/8/2004 at 2:07:17 PM. Contact: ###-####.
|
FIRE-Final Inspection | 12/8/2004 | 12/9/2004 | 12/9/2004 | P | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/8/2004 at 2:06:37 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Dec 9 2004 10:17AM.
|
BLD-Framing/Rough-in | 11/15/2004 | 11/15/2004 | 11/15/2004 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/15/2004 at 9:57:21 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 11/1/2004 | 11/2/2004 | 11/2/2004 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/1/2004 at 5:37:27 PM. Contact: ###-####. Sch a contractor via Hello! on 11/1/2004 at 5:37:27 PM. Contact: ###-####. 11/2/2004 4:03:34 PM OK to cover framing in S/W room....would like to see better support of small section of existing ceiling in West room. 11/2/2004 4:07:23 PM
|
BLD-Framing/Rough-in | 10/29/2004 | 10/29/2004 | 10/29/2004 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/29/2004 at 9:15:53 AM. Contact: ###-####. No electr or plans on site. 10/29/2004 4:23:50 PM
|