BLD-Final | 3/9/2006 | 3/9/2006 | 3/9/2006 | P | PASS |
Dave Hannah
|
|
|
christopher; Phone #: ###-#### 39 Internet Inspection Request from: Cathy Chiles ok for perm occ
|
BLD-Final | 4/20/2005 | 4/20/2005 | 4/20/2005 | A | PASS |
Dave Hannah
|
|
|
ok for perm occ
|
BLD-Framing/Rough-in | 4/18/2005 | 4/20/2005 | 4/20/2005 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/18/2005 at 4:54:29 PM. Contact: ###-####.
|
BLD-Final | 4/19/2005 | 4/19/2005 | 4/19/2005 | P | FAIL |
Dave Hannah
|
|
|
needs to remove dead bolt for hall exit door 4/19/2005 2:05:08 PM
|
FIRE-Final Inspection | 4/18/2005 | 4/18/2005 | 4/18/2005 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled
|
FIRE-Final Inspection | 4/14/2005 | 4/14/2005 | 4/14/2005 | P | FAIL |
Troy Cobbley
|
|
|
The exit signs provided needed to have a separate illumination source to be listed. They didn't and I still need the letter from the electrician
|
FIRE-Final Inspection | 4/8/2005 | 4/8/2005 | 4/8/2005 | P | FAIL |
Forrest France
|
|
|
Provide additional exit signage at northwest corner as discussed and provide letter from electrical contractor stating emergency lighting has been installed per plan, having been tested and connected to the emergency circuit
|
BLD-Framing/Rough-in | 2/7/2005 | 2/8/2005 | 2/8/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/7/2005 at 10:04:17 PM. Contact: ###-####. ok to cover back area after elec r/i 2/9/2005 7:50:15 AM
|
BLD-Framing/Rough-in | 12/8/2004 | 12/9/2004 | 12/9/2004 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/8/2004 at 5:09:43 PM. phase II ok to cover walls 12/9/2004 3:55:57 PM
|