BLD-Final | 3/10/2006 | 3/10/2006 | 3/10/2006 | P | PASS |
Jim Sly
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles OK for Perm Occ :)
|
FIRE-Final Inspection | 2/16/2006 | 2/16/2006 | 2/16/2006 | P | PASS |
Troy Cobbley
|
|
|
life safety finaled
|
BLD-Final | 2/7/2006 | 2/8/2006 | 2/8/2006 | A | PART |
Jim Sly
|
|
|
mike ; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa OK for Temp Occ. Need Perm Occ fromElectr, Fire, Code Enf and ..........
|
FIRE-Final Inspection | 2/7/2006 | 2/8/2006 | 2/7/2006 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with Dave Hannemans permission until issues with the shell building have been corrected.
|
BLD-Final | 2/3/2006 | 2/6/2006 | 2/6/2006 | A | NR |
Mike Jordan
|
|
|
Mike; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Still needs other finals prior to bldg. final.
|
BLD-Final | 2/2/2006 | 2/3/2006 | 2/3/2006 | P | NR |
Jim Sly
|
|
|
requst 3 pm//final and conference//mike heinz; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Conference | 1/10/2006 | 1/11/2006 | 1/12/2006 | P | PASS |
Jim Sly
|
|
|
mike heinz -call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Energy code compliance | 12/14/2005 | 12/15/2005 | 12/15/2005 | A | PASS |
Jim Sly
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 11/2/2005 | 11/3/2005 | 11/3/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/2/2005 at 5:36:12 PM. Gave OK to Mike to cover up selected areas for prerock.
|
BLD-Framing/Rough-in | 9/22/2005 | 9/23/2005 | 9/23/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/22/2005 at 4:22:47 PM. Contact: ###-####. Shear nailing ok
|
BLD-Framing/Rough-in | 9/7/2005 | 9/8/2005 | 9/8/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/7/2005 at 4:02:28 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 8/31/2005 | 9/1/2005 | 9/2/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/31/2005 at 1:21:18 PM. Contact: ###-####. Shear wall nailing OK at S. wall (front of bldg), East wall, and North wall. OK to cover these areas.
|
BLD-Foundation | 6/15/2005 | 6/15/2005 | 6/15/2005 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/15/2005 at 8:11:16 AM. Contact: ###-####. All foundations passed.
|
BLD-Footing | 6/13/2005 | 6/14/2005 | 6/14/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/13/2005 at 4:50:01 PM. Contact: ###-####. Interior footing pads and Elevator shaft footing OK.
|
BLD-Footing | 6/10/2005 | 6/13/2005 | 6/13/2005 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/10/2005 at 3:03:15 PM. Contact: ###-####.
|
BLD-Foundation | 4/26/2005 | 4/27/2005 | 4/27/2005 | P | PASS |
Jim Sly
|
|
|
clint; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Walls and piers. 4/27/2005 2:27:11 PM
|
BLD-Footing | 4/22/2005 | 4/25/2005 | 4/25/2005 | P | PASS |
Jim Sly
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Grading Inspection | | | | | |
|
|
|
|