Permit Information
Permit NumberBLD04-02042
StatusFinaled
Name BAUMGART CONSTRUCTION
Site Address 1375 S BROADWAY AVE
Project NameMCDONALD'S
Customer Number 
ePlanReviewNo
Description
(MCDONALD'S) Some exterior and interior remodel, mostly in the dining room area, to an existing 4,892 sq. ft. restaurant building per approved plans. Work to include removing the existing glass solarium on the front of the building, new roof structure with new support beams and steel columns at front of the building, two new exterior shear walls at front of the building, new storefront glazing at front of building, some new roofing work and exterior brick veneer work, new exterior drive-thru windows, some new interior walls, new seating layout in the dining room, new interior finish in the dining room, new suspended ceiling and soffit work in the dining room, new self-service beverage station, some accessible upgrade work, mechanical work, plumbing work, and electrical work. Special Inspection is required for structural field welding, a certificate of compliance for any steel work done in fabricator shop to be provided to inspector in field, expansion and epoxy/adhesive bolts/anchors, and shear wall hold-down installations. A new Certificate of Occupancy is to be issued when completed and approved. NOTE: This building is not fire sprinklered. (PC#0573-04) JCB
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/22/20052/23/20052/23/2005PPASS
DetailsJim Storey
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore final ok card on site.
Code Occupancy Approval2/22/20052/22/20052/22/2005PPASS
DetailsWm. Michael Meloy
Inspection noted that corrections have been made and project is now in compliance. 2/22/2005 4:26:02 PM
Permanent Occupancy 2/22/20052/22/2005 DONE
Details
Code Occupancy Approval  2/15/2005 FAIL
Inspection noted new access route from Broadway to building. Modification of front parking now included two planting areas on either side of the walkway. These planting area have a rock/gravel ground cover. A consultation with Planner Sarah Schafer confirmed that this is not acceptable as the rest of the lanscaping is bark dust. A second planting area where the walkway meets the building had the planting area disturbed leaving bare ground.

Correction notice left on building permit, which was posted on the inside of the lobby on the north glass wall. Also left, was copy of "landscaping" plan with the areas not in compliance circled in red.
BLD-Final2/10/20052/11/20052/11/2005ANR
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 2/10/2005 at 3:51:36 PM. Contact: ###-####. needs code enfor and cdhd 2/11/2005 10:48:35 AM
FIRE-Final Inspection12/21/200412/21/200412/21/2004PPASS
DetailsRick Jackson
Phil; Phone #: ###-#### Internet Inspection Request from: Jan Rice Verify that a new emergency light is added in NW seating as shown on plans 12/21/2004 11:46:21 AM
BLD-Framing/Rough-in12/9/200412/10/200412/10/2004APASS
DetailsDave Hannah
phil Note: suspended ceilings; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles--per dave hannah send out again for framing/12/10/04/mls/not done yet
BLD-Framing/Rough-in12/10/200412/10/200412/10/2004APART
DetailsDave Hannah
per dave hannah send back ceiling grid ok no notes on plan on spec for grid installer used 97 code with pods also insulation installed in ceiling ok to cover 12/10/2004 10:00:37 AM
BLD-Framing/Rough-in12/3/200412/3/200412/3/2004PPASS
DetailsJim Storey
Phil; Phone #: ###-#### Internet Inspection Request from: Jan Rice