Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD04-02044
StatusFinaled
Name BAUMGART CONSTRUCTION
Site Address 1185 S VISTA AVE
Project NameMCDONALD'S
Customer Number 
ePlanReviewNo
Description
(MCDONALD'S - ADDITION AND REMODEL) (4-8-05) THE DRAWINGS WERE MODIFIED. THE 87 SQUARE FOOT ADDITION WILL NOT BE CONSTRUCTED. THE 1ST STORY FLOOR AREA AFTER THE 112 SQUARE FOOT ADDITION WILL BE ABOUT 3,001 SQUARE FEET. THE NEW EXTERIOR WALLS WILL BE CONSTRUCTED OF 2X6 WOOD STUDS, PLYWOOD, PORTLAND CEMENT PLASTER, AND GYPSUM BOARD. THE ENTIRE BUILDING WILL BE PROVIDED WITH PORTLAND CEMENT PLASTER ON THE EXTERIOR SIDE OF EXTERIOR WALLS. THE DESIGN FOR THE RESTROOM UPGRADE WAS ALTERED BUT THE INTENT IS THAT THE RESTROOMS BE UPGRADED TO BE ACCESSIBLE TO THE DISABLED. This building is NOT fire sprinklered. To construct two (2) first story additions (87 square feet and 112 square feet) to an existing restaurant building (2,889 square foot 1st story and 1,383 square foot basement). After the expansion, the 1st story will have a floor area of 3,088 square feet. Work is to include concrete footings, concrete foundations, concrete slabs on grade, masonry exterior walls, wood beams, wood rafters, wood roof sheathing, wall furring, clay tile shingles, and interior finishes all per the approved drawings, engineering, and plan review report on file. In addition, the existing public restrooms will be upgraded to be accessible to the disabled. CUP04-00121 & CZC04-00173 **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Code Occupancy Approval8/16/20058/16/20058/16/2005PPASS
DetailsDena Gambrel
08-10-05 Passed Inspection
BLD-Final8/10/20058/11/20058/11/2005APASS
DetailsTom Arcoraci
rod; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok for perm
Permanent Occupancy 8/10/20058/10/2005 DONE
Details
FIRE-Final Inspection8/8/20058/9/20058/9/2005APASS
DetailsForrest France
Life safety passed inspection.
BLD-Framing/Rough-in8/5/20058/8/20058/8/2005APASS
DetailsTom Arcoraci
grid inspection//rod; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Energy code compliance7/26/20057/27/20057/27/2005APASS
DetailsTom Arcoraci
rod; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Framing/Rough-in7/20/20057/20/20057/20/2005PPART
DetailsTom Arcoraci
ok to insulate after other rough ins are done
BLD-Framing/Rough-in7/19/20057/20/20057/20/2005ACANC
DetailsTom Arcoraci
rod; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Framing/Rough-in7/12/20057/12/20057/12/2005PPASS
DetailsJim Storey
sheer wall ok
BLD-Framing/Rough-in7/11/20057/12/20057/12/2005ANR
DetailsJim Storey
shear wall//rod; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Foundation6/27/20056/28/20056/28/2005APASS
DetailsTom Arcoraci
under slab insulation inspection//concrete is being poured at 10am///rod ; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Foundation6/7/20056/7/20056/7/2005PPASS
DetailsTom Arcoraci
rob ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Footing5/20/20055/23/20055/23/2005APASS
DetailsTom Arcoraci
rod ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie need change for door and roof from arch
BLD-Conference5/13/20055/16/20055/16/2005APASS
DetailsTom Arcoraci
###-#### - rod Note: please 1/2 hr prior to conference ok for mono pour
BLD-Framing/Rough-in1/24/20051/24/20051/24/2005PPART
DetailsLane Manuel
###-#### Justin
bathroom framing ok 1/24/2005 2:49:46 PM
BLD-Framing/Rough-in1/6/20051/7/20051/7/2005APART
DetailsTom Arcoraci
justin; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie dinning areaok 1/7/2005 10:42:13 AM