BLD-Final | 12/23/2005 | 12/23/2005 | 12/23/2005 | P | PASS |
Forrest France
|
|
|
c/n items are complete
|
BLD-Final | 12/21/2005 | 12/21/2005 | 12/22/2005 | P | PASS |
Dave Hannah
|
|
|
ok for c.c
|
BLD-Final | 12/20/2005 | 12/21/2005 | 12/22/2005 | A | DONE |
Dave Hannah
|
|
|
Mike ###-####
|
Code Occupancy Approval | 8/2/2005 | 8/2/2005 | 8/2/2005 | P | PASS |
Wm. Michael Meloy
|
|
|
Compliance met. OK to release Bond.
|
BLD-Final | 7/22/2005 | 7/25/2005 | 7/25/2005 | A | PART |
Dave Hannah
|
|
|
mike ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok for temp occ needs other trades to go perm bond on land scaping , fire caulking ground fl finsh restrooms
|
FIRE-Final Inspection | 7/25/2005 | 7/25/2005 | 7/25/2005 | P | PART |
Forrest France
|
|
|
Temp. approval per Steve Keuter pending relocation of wall mounted strobe devices to the proper height AFF.
|
FIRE-Final Inspection | 7/21/2005 | 7/22/2005 | 7/22/2005 | A | PART |
Forrest France
|
|
|
Final pending approval of foreward flow test for backflow preventer at fire supply, and relocation of strobe FA notification devices to meet code required heights AFF.
|
FIRE-Alarm Testing | 7/21/2005 | 7/22/2005 | 7/22/2005 | A | CANC |
Forrest France
|
|
|
Duplicate inspection.
|
FIRE-Final Inspection | 7/19/2005 | 7/21/2005 | 7/21/2005 | A | FAIL |
Forrest France
|
|
|
Provide curb painting at FD access as highlighted on plans and per discussion, verify functionality of main entry/exit mag locks, provide sinage at elevators.
|
Code Occupancy Approval Temp | 7/20/2005 | 7/20/2005 | 7/21/2005 | P | FAIL |
Wm. Michael Meloy
|
|
|
Stripping not in yet. Grass area looking poor.
|
Code Occupancy Approval | 7/20/2005 | 7/20/2005 | 7/20/2005 | P | CANC |
Wm. Michael Meloy
|
|
|
|
BLD-Other | 7/14/2005 | 7/15/2005 | 7/15/2005 | A | PART |
Dave Hannah
|
|
|
mike Note: ceiling ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ceiling grid ok to cover
|
BLD-Framing/Rough-in | 7/12/2005 | 7/12/2005 | 7/12/2005 | P | PART |
Dave Hannah
|
|
|
ceiling//mike; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok to cover grid
|
BLD-Framing/Rough-in | 6/15/2005 | 6/15/2005 | 6/15/2005 | P | PART |
Dave Hannah
|
|
|
before 2:30 please///siezmic ceiling inspection please////mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ceiling grid third floor east stair tower ok to cover
|
BLD-Framing/Rough-in | 5/9/2005 | 5/9/2005 | 5/10/2005 | P | PART |
Dave Hannah
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ground floor stair and elev ok to cover
|
BLD-Framing/Rough-in | 4/27/2005 | 4/28/2005 | 4/28/2005 | A | PART |
Dave Hannah
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles second floor stair and elev towers and mec room on roof ok to cover
|
BLD-Framing/Rough-in | 4/22/2005 | 4/22/2005 | 4/22/2005 | P | PART |
Dave Hannah
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore third floor shel and core ok to start covering stair and elev shafts 4/22/2005 2:01:24 PM
|
BLD-Footing | 1/6/2005 | 1/7/2005 | 1/7/2005 | A | PASS |
Dave Hannah
|
|
|
mike///tiled up panels???; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Footing | 12/8/2004 | 12/9/2004 | 12/9/2004 | A | PART |
Dave Hannah
|
|
|
Mike; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|