BLD-Final | 1/5/2005 | 1/5/2005 | 1/5/2005 | A | PASS |
Troy James
|
|
|
|
BLD-Grading Inspection | 12/21/2004 | 12/21/2004 | 12/21/2004 | | DONE |
|
|
|
Final grading approved
|
BLD-Final | 12/18/2004 | 12/20/2004 | 12/20/2004 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 12/18/2004 at 9:09:00 PM. Contact: ###-####. Need to make the back door step compliant with code, due to the new front steps not in compliance. Approval to use the back door as entry per George Slane. 12/22/2004 11:23:15 AM
|
BLD-Footing | 10/25/2004 | 10/26/2004 | 10/26/2004 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 10/25/2004 at 2:26:53 PM. Contact: ###-####. post attachment to rock per engineering report ok. 10/26/2004 9:04:00 AM
|
BLD-Framing/Rough-in | 10/25/2004 | 10/26/2004 | 10/26/2004 | A | PART |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 10/25/2004 at 2:25:03 PM. Contact: ###-####. rough framing of new deck ok. Post attachments to rock per engineering. 10/26/2004 9:02:54 AM
|