BLD-Conference | 1/7/2008 | 1/8/2008 | 1/8/2008 | A | PASS |
Tony Young
|
|
|
Kyle, Tony, you wanted to set the time at 11 am ///dld Phone #: ###-#### structural ok now,, met w/ Sarah the struct eng..
|
BLD-Final | 1/8/2008 | 1/8/2008 | 1/8/2008 | P | PASS |
Tony Young
|
|
|
Kyle, Tony, you wanted to set the time at 11 am ///dld Phone #: ###-####
|
DOC - Permit Finaled | 1/8/2008 | 1/8/2008 | 1/8/2008 | P | PASS |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 6/5/2006 | 6/5/2006 | 6/5/2006 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 6/5/2006 at 7:42:39 AM. Contact: ###-####. partial,, c/n posted to obtain a letter of approval as built from the structural engineer of record,,, then to obtain rough inspections from trades
|
BLD-Foundation | 5/30/2006 | 5/31/2006 | 5/31/2006 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung new water proof material has been applied
|
BLD-Conference | 7/25/2005 | 7/25/2005 | 7/25/2005 | P | FAIL |
Tony Young
|
|
|
kyle; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa met w/ Engineer Sarah McClendon, ph####-####,, and owner to investigate project,,, Noticed that portion of structure was not per plan,,, also that exterior did not appear to be damped/waterproofed per 402r,, 2000,, also to provide engineer fix/ approval,, c/n to that effect
|
BLD-Framing/Rough-in | 10/15/2004 | 10/15/2004 | 10/15/2004 | P | PART |
Tony Young
|
|
|
brett; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
new masonary wall ok,,, no electrical at this point,,, need to have eng. ok as built due to logisticts of job,,, plentum not cut in yet,,,, DO NOT COVER 10/15/2004 2:02:54 PM
|
BLD-Footing | 9/24/2004 | 9/24/2004 | 9/24/2004 | P | PART |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 9/24/2004 at 11:05:51 AM. Contact: ###-####. wip asked to have engineer to verify CMU wall for compliance. 9/24/2004 2:51:10 PM
|