Permit NumberBLD04-02204
StatusFinaled
Name BECK CONSTRUCTION INC
Site Address 3100 W PLEASANTON AVE
Project NameIDAHO RIVER SPORTS
Customer Number 
ePlanReviewNo
Description
(IDAHO RIVER SPORTS) Remodel to an existing 5,391 sq. ft. building partially changing occupancy for new retail sales and storage use per approved plans, CAR04-00026, & DRH04-00218. The site also has an 887 sq. ft. storage building at the rear of the property that will have minimum one-hour rated wall infill on the south side and two-hour rated wall infill on the west side in existing window openings because of location on property. Work to include miscellaneous demolition work, some structural steel work at new or enlarged openings for new exterior windows and doors, permitting and structurally upgrading the rear addition to this building that was constructed without a permit per structural engineer, some new site work including parking, new interior walls, new interior doors and windows, some suspended ceiling work, interior finish, upgrading restrooms to current accessibility standards, new mechanical work including new furnaces, new plumbing, and new electrical work. Special Inspection required for concrete and reinforcement, for any field welding of structural steel, a certificate of compliance for any steel work done in an approved fabricator shop to be provided to inspector in field, and for epoxy/adhesive anchor installations. A Certificate of Occupancy is to be issued when completed and approved. Nonseparated Uses per IBC Section 302.3.2. NOTE: This building is located in the flood plain. All electrical outlets, panels, switches, etc..., are to be mounted 38" minimum above the finished floor to the bottom of the fixture. (Devices to be 12" minimum above base flood elevation per F.E.M.A.) NOTE: This building is not fire sprinklered. (PC#0623-04) JCB
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 5/25/20055/25/2005 DONE
Details
BLD-Other5/17/20055/18/20055/18/2005ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/17/2005 at 11:17:10 PM. Contact: ###-####.
BLD-Final3/2/20053/3/20053/3/2005APASS
DetailsDave Hannah
Gary; Phone #: ###-#### or Stan ###-#### Internet Inspection Request from: Jan Rice ok for perm occ 3/3/2005 8:45:00 AM
BLD-Final2/11/20052/11/20052/11/2005PPART
DetailsDave Hannah
Gordon; Phone #: ###-#### Internet Inspection Request from: Jan Rice ok for temp occ after boned is posted c/n items for perm occ are finsh ada restrooms 2/11/2005 3:29:19 PM
BLD-Final2/10/20052/11/20052/11/2005ANR
DetailsJim Sly
gordon; Phone #: ###-#### Internet Inspection Request from: Jan Rice Need proof of bonding for landscape, need insp from Code Inforcement, and Plumb Needs to final verified on computer (no record on computer). 2/11/2005 10:37:21 AM
FIRE-Final Inspection2/10/20052/11/20052/11/2005APASS
DetailsTroy Cobbley
fire life safety finaled 2/11/2005 10:12:43 AM
FIRE-Final Inspection2/8/20052/8/20052/8/2005PFAIL
DetailsTroy Cobbley
Provide correct remote annunciators for the duct smoke detectors and then test. Remove thumbturn from the main entry/exit. Keyed is ok. Provide approved hardware on all other doors as per review comments and drawings. Provide exit discharge lighting as per review comments. 2/8/2005 3:27:36 PM
BLD-Final2/7/20052/7/20052/7/2005PNR
DetailsTom Arcoraci
please call 15 mins prior to inspection so he can meet ya there///gordon; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Other2/7/20052/7/20052/7/2005PFAIL
DetailsTom Arcoraci
grid not per plan ok to set perimeter tiles when per plan
BLD-Framing/Rough-in12/28/200412/29/200412/29/2004APASS
DetailsDave Hannah
gordon; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in12/28/200412/29/200412/29/2004APASS
DetailsDave Hannah
gordon; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Conference10/21/200410/21/200410/21/2004PPART
DetailsBob Archibald
Met with Gary Beck on site to discuss infill framing prior to issuance of building permit. Gary was authorized to begin framing but no cover is allowed.