BLD-Final | 9/23/2005 | 9/26/2005 | 9/26/2005 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 9/23/2005 at 3:33:01 PM. Contact: ###-####. ok for perm
|
Permanent Occupancy | | 9/26/2005 | 9/26/2005 | | DONE |
|
|
|
|
FIRE-Final Inspection | 9/23/2005 | 9/23/2005 | 9/23/2005 | P | PASS |
Troy Cobbley
|
|
|
life safety finaled
|
BLD-Aging Inspection | 9/21/2005 | 9/21/2005 | 9/21/2005 | | CANC |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 7/22/2005 | 7/22/2005 | 7/22/2005 | | PASS |
Tom Arcoraci
|
|
|
|
FIRE-Conference | 5/17/2005 | 5/18/2005 | 5/18/2005 | A | DONE |
Troy Cobbley
|
|
|
fire conference//leonard; Phone #: ###-#### I went over fire dept access requirements with Leonard and gave him the copy of the approved drawings to keep for reference.
|
FIRE-Final Inspection | 4/7/2005 | 4/8/2005 | 4/8/2005 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with Dave Lokkers permission until the fire dept access plans have been review, approve and implemented
|
BLD-Final | 4/7/2005 | 4/8/2005 | 4/8/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/7/2005 at 5:14:15 PM. Contact: ###-####. ok for temp occ needs to fix landing out side of side door 4/8/2005 4:01:00 PM
|
FIRE-Final Inspection | 4/6/2005 | 4/7/2005 | 4/7/2005 | A | FAIL |
Forrest France
|
|
|
Need approved fire dept access plan
|
Code Occupancy Approval | 4/7/2005 | 4/7/2005 | 4/7/2005 | P | PASS |
Scott M.Brown
|
|
|
ok finaled signed 4/7/2005 3:57:44 PM
|
FIRE-Conference | 4/4/2005 | 4/4/2005 | 4/4/2005 | A | DONE |
Troy Cobbley
|
|
|
Contact: ###-####. Went over life safety comments with superintendant. Includes type of door hardware and fire dept access on the north side
|
BLD-Other | 3/9/2005 | 3/10/2005 | 3/10/2005 | A | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/9/2005 at 3:06:03 PM. Contact: ###-####.
|
BLD-Energy code compliance | 2/14/2005 | 2/14/2005 | 2/14/2005 | P | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 2/14/2005 at 8:27:39 AM. Contact: ###-####.
walls ok 2/14/2005 2:15:25 PM
|
BLD-Framing/Rough-in | 2/10/2005 | 2/11/2005 | 2/11/2005 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 2/10/2005 at 5:26:30 PM. Contact: ###-####. ok to start drywall 2/11/2005 10:26:42 AM
|
BLD-Framing/Rough-in | 1/19/2005 | 1/19/2005 | 1/19/2005 | A | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 1/19/2005 at 7:21:27 AM. Contact: ###-####.
need engineer to address bracing req's @ bldg front/soffit. Gave ok to apply 1/2" plywood on face of storefront.
1/19/2005 11:46:00 AM 1/19/2005 11:46:36 AM
|
BLD-Foundation | 12/2/2004 | 12/2/2004 | 12/2/2004 | P | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 12/2/2004 at 8:37:48 AM. Contact: ###-####.
stemwalls and piers at columns ok.
MTI to provide special insp. 12/2/2004 12:25:11 PM
|
BLD-Footing | 11/24/2004 | 11/29/2004 | 11/29/2004 | A | PASS |
Tom Arcoraci
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles pending mti reports 11/29/2004 9:09:38 AM
|