BLD-Final | 6/30/2005 | 6/30/2005 | 6/30/2005 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 6/30/2005 at 5:26:01 AM. Contact: ###-####. c of o issued
|
BLD-Final | 6/28/2005 | 6/29/2005 | 6/30/2005 | P | CANC |
Tony Young
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Grading Inspection | 6/30/2005 | 6/30/2005 | 6/30/2005 | | DONE |
|
|
|
Final grading and drainage approved.
|
DOC - Permit Finaled | 6/30/2005 | 6/30/2005 | 6/30/2005 | P | PASS |
Tony Young
|
|
|
|
BLD-Wall cover | 4/7/2005 | 4/8/2005 | 4/8/2005 | P | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 4/7/2005 at 12:35:17 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/5/2005 | 4/6/2005 | 4/6/2005 | P | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 4/5/2005 at 9:22:52 AM. Contact: ###-####.draftstopping mech. chase and triange dead space second level, strap top plates at master bedroom and open area at first and second level 4/6/2005 12:23:24 PM
|
BLD-Framing/Rough-in | 4/5/2005 | 4/6/2005 | 4/6/2005 | A | PASS |
Troy James
|
|
|
shear inspection
|
BLD-Footing | 1/18/2005 | 1/18/2005 | 1/18/2005 | P | PART |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 1/18/2005 at 8:03:58 AM. Contact: ###-####. rebar in place, wip 1/18/2005 2:37:53 PM
|
BLD-Footing | 1/13/2005 | 1/13/2005 | 1/13/2005 | P | PART |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 1/13/2005 at 7:09:18 AM. set backs ok 1/13/2005 2:48:53 PM
|
BLD-Grading Inspection | 1/12/2005 | 1/12/2005 | 1/12/2005 | | DONE |
|
|
|
footing subgrade approved by the geotechnical engineer
|