BLD-Aging Inspection | 6/10/2008 | 6/10/2008 | 6/10/2008 | | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 6/10/2008 | 6/10/2008 | 6/10/2008 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 4/10/2008 | 4/10/2008 | 4/10/2008 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
Code Occupancy Approval | | | 4/2/2008 | | DONE |
|
|
|
Landscaping, lot improvements, other plan requirements met here. Extensive landscaping completed per bld04-02464 and DRH03-00186.
|
BLD-Aging Inspection | 3/20/2008 | 3/20/2008 | 3/20/2008 | | DEFR |
Jim Storey
|
|
|
fir sprk permit out standing defr. to fir.
|
BLD-Conference | 1/16/2008 | 1/16/2008 | 1/16/2008 | P | PASS |
Jim Storey
|
|
|
mike Phone #: ###-####
|
BLD-Conference | 1/7/2008 | 1/8/2008 | 1/8/2008 | A | PASS |
Jim Storey
|
|
|
Mike Please call 1/2 hr before going out Phone #: ###-####
|
BLD-Aging Inspection | 1/4/2008 | 1/4/2008 | 1/4/2008 | | PASS |
Jim Storey
|
|
|
work still in progress.
|
BLD-Aging Inspection | 10/22/2007 | 10/22/2007 | 10/23/2007 | | NR |
Jim Storey
|
|
|
fir permit open
|
BLD-Aging Inspection | 7/19/2007 | 7/19/2007 | 7/24/2007 | | PASS |
Jim Storey
|
|
|
wip pending all others.
|
BLD-Aging Inspection | 4/17/2007 | 4/17/2007 | 4/18/2007 | | NR |
Jim Storey
|
|
|
pending fire
|
FIRE-Final Inspection | 2/13/2007 | 2/15/2007 | 2/15/2007 | A | NR |
Forrest France
|
|
|
Missing second pc. 401 FS escutcheons at building A1 canopy, provide knox box, scaffold at the perimeter of bld A1 must be removed prior to final.
|
FIRE-Final Inspection | 1/29/2007 | 1/30/2007 | 1/30/2007 | A | FAIL |
Forrest France
|
|
|
The project related fire sprinkler permit must be approved for final prior to building life safety final.
|
FIRE-Supply Line Flush | 1/18/2007 | 1/19/2007 | 1/19/2007 | A | PART |
Forrest France
|
|
|
Inspection scheduled for an UG fire supply line flush for the project related fire sprinkler permit, flush completed satisfactory.
|
FIRE-Supply Line Flush | 1/18/2007 | 1/18/2007 | 1/18/2007 | P | DEFR |
Forrest France
|
|
|
Rescheduled
|
FIRE-Supply Line Flush | 1/16/2007 | 1/16/2007 | 1/16/2007 | P | NR |
Forrest France
|
|
|
Lacking coordination to provide water supply for UG fire line flush.
|
BLD-Framing/Rough-in | 12/11/2006 | 12/13/2006 | 12/13/2006 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Todd Kurns
|
BLD-Framing/Rough-in | 12/1/2006 | 12/4/2006 | 12/4/2006 | A | FAIL |
Jim Storey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Todd Kurns still missing bracing and need resolve to diaphram hardware atchment.
|
BLD-Framing/Rough-in | 11/27/2006 | 11/28/2006 | 11/28/2006 | P | FAIL |
Jim Storey
|
|
|
Jim, Can you please call me and let me know what time you will be here so I can let my framer know. Thanks, Todd; Phone #: ###-#### Internet Inspection Request from: Todd Kurns
|
BLD-Framing/Rough-in | 11/14/2006 | 11/14/2006 | 11/14/2006 | P | PART |
Jim Storey
|
|
|
todd; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Other | 9/18/2006 | 9/18/2006 | 9/18/2006 | P | PASS |
Jim Storey
|
|
|
Jim, this inspection is for the acoustical ceiling in Lee's Candy Store; Phone #: ###-#### Internet Inspection Request from: Todd Kurns
|
BLD-Footing | 8/24/2006 | 8/25/2006 | 8/25/2006 | A | PASS |
Jim Storey
|
|
|
Jim, Concrete is suppose to start showing up at 10:00AM Thanks, Todd; Phone #: ###-#### Internet Inspection Request from: Todd Kurns
|
BLD-Footing | 8/20/2006 | 8/21/2006 | 8/21/2006 | A | PASS |
Jim Storey
|
|
|
Jim, we are getting concrete at 1:00PM Can you do the inspection right before lunch? Thanks,; Phone #: ###-#### Internet Inspection Request from: Todd Kurns
|
BLD-Framing/Rough-in | 8/15/2006 | 8/16/2006 | 8/16/2006 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Todd Kurns
|
FIRE-Sprinkler Rough-in | 8/15/2006 | 8/15/2006 | 8/15/2006 | P | PART |
Forrest France
|
|
|
Inspection for approval to cover OH fire sprinkler installation at the Dollar store drop ceiling areas, rough-in is okay for the drop ceiling only. Noted to GC the fire sprinkler permit is only issued in a "partial" status due to resubmittal items required per plan review. Also noted that it appears no UG permit for the fire supply connection has been issued for bldg A1.
|
FIRE-Sprinkler Rough-in | 8/9/2006 | 8/10/2006 | 8/10/2006 | A | FAIL |
Forrest France
|
|
|
Forest, This is an inspection for the fire riser underground and thrust blocking at bldg A-1, I did not know exactly what inspection that was listed under. Thanks, Todd; Phone #: ###-#### Internet Inspection Request from: Todd Kurns NOTE: No sprinkler permit related to the UG work could be located, notified contractor of possible work without permit.
|
BLD-Foundation | 7/19/2006 | 7/20/2006 | 7/20/2006 | A | PART |
Mike Jordan
|
|
|
Tony, this is our stem wall inspection we are pouring concrete at noon thanks,todd; Phone #: ###-#### Internet Inspection Request from: Todd Kurns. Store front for Lees Candy was changed, Door shrunk and windows were moved . Exisiting verts at jambs no longer match changes. Contractor awaiting fix from structural engineer. Will have RFI from enginner for city and will get special insp. if any is required.
|
BLD-Footing | 7/17/2006 | 7/18/2006 | 7/18/2006 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### Internet Inspection Request from: Todd Kurns 6 column ftgs and front ftg in front of lees candies ok
|
BLD-Framing/Rough-in | 7/6/2006 | 7/10/2006 | 7/10/2006 | A | FAIL |
Jim Storey
|
|
|
Jim, This will be a partial inspection on the framing so that the stucco contractor can start covering; Phone #: ###-#### Internet Inspection Request from: Todd Kurns need engineering to justify 3/4 for sheer nail sch. need blk and nail all other walls and roof diaphrams. thru bolts at glb conections.
|
BLD-Other | 6/30/2006 | 6/30/2006 | 6/30/2006 | A | PASS |
Mike Jordan
|
|
|
Demo (phase 1) complete. Verify removal of 16K + sq .ft structure. Bldg. has been demoed and removed. Hole is to be backfilled. Did note some on site material with excessive const. debri making this fill unsuitable for backfill. GC was notified and also left message with jobsite super and contacted special insp. agency.
|
BLD-Footing | 6/7/2006 | 6/9/2006 | 6/9/2006 | A | PASS |
Jim Storey
|
|
|
Jim, The cement truck is scheduled for 11:00 AM delivery. Could you please inspect before that. Thanks,; Phone #: ###-#### Internet Inspection Request from: Todd Kurns
|
BLD-Framing/Rough-in | 6/7/2006 | 6/7/2006 | 6/7/2006 | A | PASS |
Jim Storey
|
|
|
Backing and blocking for rough sawn timbers in order to cover wall; Phone #: ###-#### Internet Inspection Request from: Todd Kurns
|
BLD-Footing | 5/15/2006 | 5/16/2006 | 5/16/2006 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Todd Kurns
|
BLD-Footing | 5/12/2006 | 5/15/2006 | 5/15/2006 | A | CANC |
Jim Storey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Todd Kurns
|
BLD-Footing | 5/12/2006 | 5/12/2006 | 5/12/2006 | P | CANC |
Jim Storey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Todd Kurns Inspection cancelled from web by: Todd Kurns
|
BLD-Final | 4/9/2008 | 4/10/2008 | | A | |
Jim Storey
|
|
|
Todd Phone #: ###-####
|