BLD-Final | 7/12/2006 | 7/13/2006 | 7/13/2006 | A | NR |
Tom Arcoraci
|
|
|
vern; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
FIRE-Final Inspection | 7/12/2006 | 7/12/2006 | 7/12/2006 | P | PASS |
Troy Cobbley
|
|
|
Life safety finaled. Vern is in the process of installing the individual tenant addresses.
|
Code Occupancy Approval Temp | | | 7/12/2006 | | FAIL |
|
|
|
MUST BOND FOR $28,200 INCOMPLETE LANDSCAPE
|
FIRE-Final Inspection | 7/6/2006 | 7/6/2006 | 7/6/2006 | P | CANC |
Troy Cobbley
|
|
|
To be rescheduled for tomorrow
|
FIRE-Conference | 2/16/2006 | 2/17/2006 | 2/17/2006 | A | DONE |
Troy Cobbley
|
|
|
I went over the life safety comments with Vern. Issues will be fire dept access, addressing and the fire sprinklers getting finaled. Door hardware will be addressed in the T.I. stage.
|
BLD-Energy code compliance | 2/1/2006 | 2/2/2006 | 2/2/2006 | A | PART |
Jim Sly
|
|
|
Clint; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong Frame and Energy OK......1st 2 office spaces....starting from S end of Bldg
|
BLD-Conference | 1/24/2006 | 1/25/2006 | 1/25/2006 | A | DONE |
Jim Sly
|
|
|
Vern ; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong Met with Vern.
|
BLD-Other | 8/4/2005 | 8/4/2005 | 8/4/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/4/2005 at 9:47:20 AM. Contact: ###-####. C/N....Eng of record to approve mortar at CMU walls which failed to meet specified PSI strength......OR...... Contractor to remove and replace deficient mortar. Special insp tests and approvals req. for new mortar replacement.
|
BLD-Foundation | 6/8/2005 | 6/8/2005 | 6/8/2005 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/8/2005 at 7:18:48 AM. Column pads at entrys OK
|
BLD-Footing | 6/7/2005 | 6/7/2005 | 6/7/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/7/2005 at 7:25:22 AM. 6 footing pads at exterior doors OK.
|
BLD-Framing/Rough-in | 6/2/2005 | 6/3/2005 | 6/3/2005 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 6/2/2005 at 1:13:39 PM. Contact: ###-####. over build inspections,, ok to cover,, 2 areas
|
BLD-Other | 5/10/2005 | 5/11/2005 | 5/11/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/10/2005 at 12:54:52 PM. Contact: ###-####. Advised for special inspection CMU shear/grout fill required. 5/11/2005 1:00:30 PM
|
BLD-Footing | 4/14/2005 | 4/14/2005 | 4/14/2005 | P | PART |
Jim Sly
|
|
|
gary; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Footing piers for columns at ext..OK (approx 20) 4/14/2005 2:21:19 PM
|
BLD-Footing | 4/13/2005 | 4/13/2005 | 4/13/2005 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/13/2005 at 7:27:33 AM.
|
BLD-Framing/Rough-in | 4/12/2005 | 4/12/2005 | 4/12/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/12/2005 at 9:10:13 AM. Contact: ###-####. NW office and hall OK. 4/12/2005 3:28:53 PM
|
BLD-Foundation | 4/4/2005 | 4/4/2005 | 4/4/2005 | P | PASS |
Jim Sly
|
|
|
gary; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Foot OK for small bldg at S. side. 4/4/2005 2:31:22 PM
|
BLD-Footing | 3/30/2005 | 3/31/2005 | 3/31/2005 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/30/2005 at 8:59:55 PM. Contact: ###-####. Footing for small S. Bldg section approx 20x25' and Pads for porches. OK 3/31/2005 10:40:21 AM
|
BLD-Footing | 3/22/2005 | 3/22/2005 | 3/22/2005 | P | CANC |
Jim Sly
|
|
|
gary; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Canc by Contr. 3/22/2005 3:43:20 PM
|
BLD-Footing | 3/17/2005 | 3/18/2005 | 3/18/2005 | P | NR |
Jim Sly
|
|
|
gary; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Footing | 3/17/2005 | 3/18/2005 | 3/18/2005 | P | NR |
Jim Sly
|
|
|
gary; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Final | 3/14/2005 | 3/15/2005 | 3/15/2005 | A | PART |
Jim Sly
|
|
|
clint; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Should be frame.....Offices at W. end OK. 3/15/2005 2:38:14 PM
|
FIRE-Final Inspection | 3/14/2005 | 3/15/2005 | 3/15/2005 | A | NR |
Troy Cobbley
|
|
|
clint; Phone #: ###-#### Job is not ready for inspection. 3/15/2005 11:23:25 AM
|
BLD-Framing/Rough-in | 3/7/2005 | 3/8/2005 | 3/8/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/7/2005 at 9:10:43 AM. Contact: ###-####. Shear wall foundations poured (for Main BLDG) ....Need special insp reports or approval from Engineer of record. Framing OK for 3 small offices located at West end. 3/8/2005 1:44:06 PM
|
BLD-Footing | 2/22/2005 | 2/22/2005 | 2/22/2005 | P | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 2/22/2005 at 10:16:56 AM.
epoxied dowels, and piers ok.
Strata to do special insp. 2/22/2005 2:40:22 PM
|
BLD-Foundation | 2/22/2005 | 2/22/2005 | 2/22/2005 | P | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 2/22/2005 at 10:15:21 AM.
strata to do 2/22/2005 2:41:01 PM special insp. 2/22/2005 2:41:11 PM
|