Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD04-02470
StatusFinaled
Name TED MASON COMMERCIAL INC
Site Address 1803 N WILDWOOD AVE
Project NameSTEELWOOD FLEX CONDOS
Customer Number 
ePlanReviewNo
Description
(STEELWOOD FLEXIBLE COMMERCIAL CONDOMINIUMS)Building #1 This building is fire sprinklered for building area increase. To divide an existing 27,300 square foot building into 20 separate tenant spaces. This building is divided into separate condominiums to allow each unit to be separately owned. Work is to include interior walls, restrooms accessible to the disabled, exterior canopies, overhead doors, man doors, windows, masonry shear walls, and brick veneer all per the approved drawings, engineering, and plan review report on file. This permit does NOT establish a Certificate of Occupancy for any tenant space. Before occupancy, each tenant shall acquire a Certificate of Occupancy for the specific individual tenant space. No unit shall be sold as an individual unit until the condominium plat is recorded with Ada County. The fire sprinkler system shall comply with NFPA 13-2002 as regulated by the Fire Department. DRH04-00214 **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/12/20067/13/20067/13/2006ANR
DetailsTom Arcoraci
vern; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
FIRE-Final Inspection7/12/20067/12/20067/12/2006PPASS
DetailsTroy Cobbley
Life safety finaled. Vern is in the process of installing the individual tenant addresses.
Code Occupancy Approval Temp  7/12/2006 FAIL
MUST BOND FOR $28,200 INCOMPLETE LANDSCAPE
FIRE-Final Inspection7/6/20067/6/20067/6/2006PCANC
DetailsTroy Cobbley
To be rescheduled for tomorrow
FIRE-Conference2/16/20062/17/20062/17/2006ADONE
DetailsTroy Cobbley
I went over the life safety comments with Vern. Issues will be fire dept access, addressing and the fire sprinklers getting finaled. Door hardware will be addressed in the T.I. stage.
BLD-Energy code compliance2/1/20062/2/20062/2/2006APART
DetailsJim Sly
Clint; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
Frame and Energy OK......1st 2 office spaces....starting from S end of Bldg
BLD-Conference1/24/20061/25/20061/25/2006ADONE
DetailsJim Sly
Vern ; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
Met with Vern.
BLD-Other8/4/20058/4/20058/4/2005PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 8/4/2005 at 9:47:20 AM. Contact: ###-####.
C/N....Eng of record to approve mortar at CMU walls which failed to meet specified PSI strength......OR...... Contractor to remove and replace deficient mortar. Special insp tests and approvals req. for new mortar replacement.
BLD-Foundation6/8/20056/8/20056/8/2005APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 6/8/2005 at 7:18:48 AM.
Column pads at entrys OK
BLD-Footing6/7/20056/7/20056/7/2005PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 6/7/2005 at 7:25:22 AM.
6 footing pads at exterior doors OK.
BLD-Framing/Rough-in6/2/20056/3/20056/3/2005APART
DetailsTony Young
Scheduled by a contractor via Hello! on 6/2/2005 at 1:13:39 PM. Contact: ###-####.
over build inspections,, ok to cover,, 2 areas
BLD-Other5/10/20055/11/20055/11/2005APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 5/10/2005 at 12:54:52 PM. Contact: ###-####. Advised for special inspection CMU shear/grout fill required. 5/11/2005 1:00:30 PM
BLD-Footing4/14/20054/14/20054/14/2005PPART
DetailsJim Sly
gary; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Footing piers for columns at ext..OK (approx 20) 4/14/2005 2:21:19 PM
BLD-Footing4/13/20054/13/20054/13/2005PNR
DetailsJim Sly
Scheduled by a contractor via Hello! on 4/13/2005 at 7:27:33 AM.
BLD-Framing/Rough-in4/12/20054/12/20054/12/2005PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 4/12/2005 at 9:10:13 AM. Contact: ###-####. NW office and hall OK. 4/12/2005 3:28:53 PM
BLD-Foundation4/4/20054/4/20054/4/2005PPASS
DetailsJim Sly
gary; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Foot OK for small bldg at S. side. 4/4/2005 2:31:22 PM
BLD-Footing3/30/20053/31/20053/31/2005APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 3/30/2005 at 8:59:55 PM. Contact: ###-####. Footing for small S. Bldg section approx 20x25' and Pads for porches. OK 3/31/2005 10:40:21 AM
BLD-Footing3/22/20053/22/20053/22/2005PCANC
DetailsJim Sly
gary; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Canc by Contr. 3/22/2005 3:43:20 PM
BLD-Footing3/17/20053/18/20053/18/2005PNR
DetailsJim Sly
gary; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Footing3/17/20053/18/20053/18/2005PNR
DetailsJim Sly
gary; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Final3/14/20053/15/20053/15/2005APART
DetailsJim Sly
clint; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Should be frame.....Offices at W. end OK. 3/15/2005 2:38:14 PM
FIRE-Final Inspection3/14/20053/15/20053/15/2005ANR
DetailsTroy Cobbley
clint; Phone #: ###-#### Job is not ready for inspection. 3/15/2005 11:23:25 AM
BLD-Framing/Rough-in3/7/20053/8/20053/8/2005APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 3/7/2005 at 9:10:43 AM. Contact: ###-####. Shear wall foundations poured (for Main BLDG) ....Need special insp reports or approval from Engineer of record. Framing OK for 3 small offices located at West end. 3/8/2005 1:44:06 PM
BLD-Footing2/22/20052/22/20052/22/2005PPART
DetailsLane Manuel
Scheduled by a contractor via Hello! on 2/22/2005 at 10:16:56 AM.
epoxied dowels, and piers ok.
Strata to do special insp. 2/22/2005 2:40:22 PM
BLD-Foundation2/22/20052/22/20052/22/2005PPART
DetailsLane Manuel
Scheduled by a contractor via Hello! on 2/22/2005 at 10:15:21 AM.
strata to do 2/22/2005 2:41:01 PM special insp. 2/22/2005 2:41:11 PM