BLD-Final | 4/14/2005 | 4/15/2005 | 4/15/2005 | P | PASS |
Jim Storey
|
|
|
###-####
|
DOC - Permit Finaled | 4/15/2005 | 4/15/2005 | 4/15/2005 | P | PASS |
Jim Storey
|
|
|
###-####
|
BLD-Energy code compliance | 2/15/2005 | 2/16/2005 | 2/16/2005 | A | PASS |
Jim Storey
|
|
|
###-#### troy
|
BLD-Framing/Rough-in | 2/15/2005 | 2/16/2005 | 2/16/2005 | A | PASS |
Jim Storey
|
|
|
###-#### troy made ok
|
BLD-Framing/Rough-in | 2/10/2005 | 2/11/2005 | 2/11/2005 | A | CANC |
Lane Manuel
|
|
|
troy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 2/10/2005 | 2/11/2005 | 2/11/2005 | P | PART |
Lane Manuel
|
|
|
###-#### - troy
|
BLD-Framing/Rough-in | 2/10/2005 | 2/10/2005 | 2/10/2005 | P | CANC |
Jim Storey
|
|
|
troy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Foundation | 11/29/2004 | 11/29/2004 | 11/29/2004 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/29/2004 at 8:19:41 AM. Contact: ###-####.
|
BLD-Footing | 11/24/2004 | 11/24/2004 | 11/24/2004 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/24/2004 at 7:36:03 AM. Contact: ###-####. every thing ok called contractor told his message mec that they looked close on the east side prop line to check befor pouring 11/24/2004 12:35:23 PM
|