Permit Information
Permit NumberBLD04-02708
StatusFinaled
Name FEDERAL DEFENDERS OFFICE
Site Address 350 N 9TH ST
Project NameJEFFERSON PLACE
Customer Number 
ePlanReviewNo
Description
(FEDERAL DEFENDERS OFFICE - TENANT EXPANSION - 3RD FLOOR) Under the 1979 UBC, the fire sprinkler system is used to allow the 5th story. To reconfigure an existing office tenant space located on the 3rd floor of an existing 5 story building. This space will be expanded into an adjacent 1,278 square foot area on one side and reduced by 418 square feet on another side. After the remodel, this tenant space will have a total floor area of about 3,837 square feet. Work is to include interior nonbearing walls, a 1-hr corridor wall, two 20-minute doors in the corridor wall, wire glass, and finishes. The existing 1-hr corridor located outside of this tenant space shall, as a minimum, be maintained in compliance with the 1979 UBC. Alterations to that corridor shall comply with the 2000 IBC where practicable. All work shall be in accordance with the approved drawings and the plan review report on file. The location of fire sprinkler heads shall comply with NFPA 13-2002 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection4/13/20054/13/20054/13/2005PPASS
DetailsForrest France
Fire life safety passed inspection.
FIRE-Final Inspection4/12/20054/13/20054/13/2005AFAIL
DetailsForrest France
Fire extinguisher needs current inspection tag.
BLD-Final4/12/20054/13/20054/13/2005PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/11/2005 at 3:45:48 PM. Contact: ###-####.ok for perm occ 4/13/2005 1:57:54 PM
Permanent Occupancy 4/13/20054/13/2005 DONE
Details
BLD-Final4/11/20054/12/20054/12/2005ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/11/2005 at 3:45:48 PM. Contact: ###-####.
FIRE-Final Inspection3/24/20053/25/20053/25/2005AFAIL
DetailsTroy Cobbley
dave; Phone #: ###-#### The emergency light at the north side of the elevator lobby has not been installed yet. 3/25/2005 10:44:26 AM
BLD-Final3/14/20053/14/20053/14/2005PNR
DetailsDave Hannah
dave- ###-####
FIRE-Final Inspection3/14/20053/14/20053/14/2005PFAIL
DetailsTroy Cobbley
dave ###-#### Provide fire extinguisher per review comment #4, Provide additional exit signs as per drawing sheet #A2.3 and provide emergency lighting in north side of elevator lobby and in both exit corridors. 3/14/2005 2:19:27 PM
BLD-Framing/Rough-in2/21/20052/22/20052/22/2005APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/21/2005 at 1:07:00 PM. Contact: ###-####. ph 2 int walls ok to cover 2/22/2005 11:00:02 AM
BLD-Conference1/20/20051/21/20051/21/2005APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/20/2005 at 2:07:22 PM. Contact: ###-####. went over 1hr ceiling sytem 1/21/2005 1:17:08 PM
BLD-Conference1/21/20051/21/20051/21/2005PDONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/20/2005 at 2:07:22 PM. Contact: ###-####.
BLD-Conference12/29/200412/30/200412/30/2004ADONE
DetailsDave Hannah
dave; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles talked with carel westfall about arcetect using a one hr suspended ceiling system in tenent space his ok with that met with contractor he will get instulation instructions and install 12/30/2004 10:12:23 AM
BLD-Framing/Rough-in12/23/200412/27/200412/27/2004PPART
DetailsDave Hannah
needs to ext walls to under side of 4th floor along corrodor 12/27/2004 2:48:58 PM
BLD-Framing/Rough-in12/23/200412/23/200412/23/2004PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/23/2004 at 8:34:59 AM. Contact: ###-####. ok to cover int walls but need to rework 1 hr corrodor walls 12/23/2004 7:35:05 PM