Permit Number | BLD04-02772 |
Status | Finaled |
Name |
BOISE AIR TERMINAL (REMODEL & WALKWAY)
|
Site Address |
3201 W AIRPORT WAY
|
Project Name | AIRPORT |
Customer Number | |
ePlanReview | No |
Description |
(BOISE AIR TERMINAL - CONCOURSE B AND AIRCRAFT LOADING WALKWAY) Both Concourse B buildings are fire sprinklered to substitute for 1-hr fire-resistance rated construction. To construct a new entrance vestibule and support structure to serve a new aircraft loading walkway at "Original Concourse B". Work is to include a concrete foundation, cantilevered beams, concrete floor deck, spray applied fire-proofing, steel roof deck, welding, and equipment. Also, to remodel the interior of "Original Concourse B" and "Concourse B Extension". An elevated concrete floor/ramp will be constructed over the existing floor AND the 4 existing restrooms will be remodeled. At least one of each type of fixture in each restroom shall be accessible to the disabled. Work is to include strengthening existing steel floor beams, welding, new floor finishes, new wall finishes, new ceilings finishes, and new ceiling tile. All work shall comply with the approved drawings and the plan review report on file. The fire sprinkler systems shall comply with NFPA 13-2002 as regulated by the Fire Department. **CJW**
|