Permit Information
Permit NumberBLD04-02876
StatusFinaled
Name DEVCON CONSTRUCTION INC
Site Address 495 S CAPITOL BLVD
Project NameBODO BLDG #8
Customer Number 
ePlanReviewNo
Description
*BODO Building #8 - Hampton Inns Hotel (Shell) - per Cody R. no occupancy on the Hotel ONLY until the DR requirements are met. (the Retail is ok) Exterior Paint color not correct.To construct a new 235,965 square foot, eleven story high rise, concrete and steel framed retail, parking and hotel shell building. When finished, the first floor will contain 7,775 sq. ft. of retail space, 9,000 sq. ft. of hotel lobby space and 19,020 sq. ft. of parking garage space (total 35,795 sq. ft.). The second, third and fourth floors will be parking garage (34,750 sq. ft. each floor, total of 104,250 sq. ft.). The fifth floor will contain hotel rooms, laundry, meeting rooms, exercise room and indoor swimming pool (16,000 sq. ft.). The sixth through eleventh floors will contain hotel guest rooms (13,320 sq. ft. per floor, total 79,920 sq. ft.). This is a shell permit only. No occupancy is allowed under this permit. A separate tenant improvement permit is required to finish this building for occupancy. The fire-resistance rating reductions allowed by IBC, Sections 403.3.1 and 403.3.2 is being used to reduce the required fire-resistive rating from Type IB to Type IIA. The reduction is allowed in this building with the use of sprinkler control valves equipped with supervisory initiating devices and water-flow initiating devices for each floor. The other requirement of this reduction is the construction of two-hour fire-barriers between the first floor mercantile occupancies and the remainder of the building. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/2/20072/5/20072/5/2007PNR
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Victoria Beall needs other trades finaled
FIRE-Final Inspection2/2/20072/5/20072/5/2007APART
DetailsForrest France
Final fire life safety pending completion of correction notice items for the permit attatched fire alarm and sprinkler permits, see c/n dated 2/2/07.
BLD-Other2/16/20062/16/20062/16/2006PDONE
DetailsDave Hannah
Dave: Please call Dennis -###-#### for garage walk-though and hotel fire proofing detail (small) discussion. Internet Inspection Request from: Alex Monge
BLD-Conference2/1/20062/2/20062/2/2006APASS
DetailsDave Hannah
Bulding 8 conference...call dennis. Internet Inspection Request from: Alex Monge
BLD-Other1/20/20061/20/20061/23/2006PPASS
DetailsDave Hannah
Contact Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos
BLD-Conference1/13/20061/16/20061/17/2006PDONE
DetailsDave Hannah
Dennis Harter Request; Phone #: ###-#### Internet Inspection Request from: Alex Monge
BLD-Conference1/10/20061/11/20061/12/2006PDONE
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Alex Monge
BLD-Other1/9/20061/10/20061/11/2006PDONE
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Alex Monge
BLD-Framing/Rough-in12/19/200512/20/200512/21/2005APART
DetailsDave Hannah
Lombac Requested Framing Inspection; Phone #: ###-#### Internet Inspection Request from: Alex Monge walked garage area every thing looking good
BLD-Framing/Rough-in12/8/200512/8/200512/8/2005PPART
DetailsDave Hannah
Please call John with Lombac; Phone #: ###-#### Internet Inspection Request from: Ben Kos
BLD-Framing/Rough-in12/7/200512/8/200512/8/2005APART
DetailsDave Hannah
Please call John with Lombac; Phone #: ###-#### Internet Inspection Request from: Ben Kos shafts stair towers walls ground floor to third floor looking good to this point
BLD-Framing/Rough-in11/11/200511/15/200511/16/2005APART
DetailsDave Hannah
John Woods w/Lombac; Phone #: ###-#### Internet Inspection Request from: Alex tenent seperation between garage gruond floor ok for second layer
BLD-Framing/Rough-in10/21/200510/24/200510/24/2005APART
DetailsDave Hannah
John Woods is contact number provided; Phone #: ###-#### Internet Inspection Request from: Alex Monge walked stairs for garage ok to proceed
BLD-Framing/Rough-in10/12/200510/12/200510/13/2005PPART
DetailsDave Hannah
Building #8 Exterior Framing; Phone #: ###-#### Internet Inspection Request from: Alex Monge looked at ext framing roof to 4th floor
BLD-Conference10/11/200510/12/200510/13/2005ADONE
DetailsDave Hannah
Building #8 Exterior Framing; Phone #: ###-#### Internet Inspection Request from: Alex Monge
BLD-Framing/Rough-in9/16/20059/16/20059/19/2005PPART
DetailsDave Hannah
Call John with Lombac; Phone #: ###-#### Internet Inspection Request from: Ben Kos walled floors 5 to roof looking at ext wall framing everything ok to date
BLD-Framing/Rough-in9/13/20059/15/20059/16/2005PPART
DetailsDave Hannah
Call John with Lombac; Phone #: ###-#### Internet Inspection Request from: Ben Kos walked project to look at ext framing
FIRE-Conference8/2/20058/2/20058/2/2005ADONE
DetailsForrest France
On site discussion with Wil Northup and Bill Alexander regarding the installation of an above ground water storage tank for supplemental fire sprinkler supply. The tank was installed without an FIR permit and thus not reviewed or approved for code compliance. The general and subcontractors involved were made aware of the situation.
BLD-Conference5/4/20055/5/20055/5/2005ADONE
DetailsDave Hannah
pre construction meeting