BLD-Final | 4/1/2005 | 4/4/2005 | 4/4/2005 | A | PASS |
Troy James
|
|
|
dee; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
Permanent Occupancy | | 4/4/2005 | 4/4/2005 | | DONE |
|
|
|
|
BLD-Final | 3/28/2005 | 3/29/2005 | 3/29/2005 | P | PART |
Troy James
|
|
|
dee; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
temp final, need mechanical and electrical to final, new mech. and electrical permit for press machine to be installed 3/29/2005 3:14:00 PM 3/29/2005 3:15:58 PM
|
FIRE-Final Inspection | 3/29/2005 | 3/29/2005 | 3/29/2005 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled 3/29/2005 2:13:03 PM
|
BLD-Final | 3/24/2005 | 3/28/2005 | 3/28/2005 | A | NR |
Jim Sly
|
|
|
dee; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Need Fire final. 3/28/2005 10:21:38 AM
|
FIRE-Final Inspection | 3/28/2005 | 3/28/2005 | 3/28/2005 | P | FAIL |
Troy Cobbley
|
|
|
Repair three exit signs and one emergency light. Repair remote annunciators and provide one additional duct smoke to the hvac unit number three. 3/28/2005 3:59:05 PM
|
FIRE-Final Inspection | 3/24/2005 | 3/25/2005 | 3/25/2005 | P | CANC |
Troy Cobbley
|
|
|
Not ready 3/25/2005 3:05:10 PM
|
BLD-Other | 3/16/2005 | 3/17/2005 | 3/17/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/16/2005 at 4:43:52 PM. Contact: ###-####. ceiling cover drafstop and ipods ok ok to drop in ceiling panels 3/17/2005 1:48:48 PM
|
BLD-Wall cover | 3/15/2005 | 3/16/2005 | 3/16/2005 | P | PART |
Troy James
|
|
|
###-#### - dee - Note: ceiling cover
seal draft stop and need ipods at front of store, back room not ready 3/16/2005 4:11:08 PM
|
FIRE-Conference | 3/10/2005 | 3/10/2005 | 3/10/2005 | P | DONE |
Troy Cobbley
|
|
|
Contractor had questions about the fire rated corridor. 3/10/2005 4:35:47 PM
|
BLD-Other | 3/2/2005 | 3/3/2005 | 3/3/2005 | P | PART |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 3/2/2005 at 1:59:49 PM. Contact: ###-####. ok screws corridor walls and framing for draft stop. 3/3/2005 2:59:18 PM
|
BLD-Framing/Rough-in | 3/1/2005 | 3/2/2005 | 3/2/2005 | P | PART |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 3/1/2005 at 2:06:55 PM. Contact: ###-####. ok to cover walls only, need nailing inspection to corridor walls 3/2/2005 1:17:22 PM
|