Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD04-02937
StatusFinaled
Name BENCHMARK CONSTRUCTION INC
Site Address 11655 W MCMILLAN RD
Project NameCross of Christ Church
Customer Number 
ePlanReviewNo
Description
*Cross of Christ Evangelical Lutheran Church* To construct a 20,506 sq. ft one story addition to an existing 6, 010 sq. ft. church building. Construction will be masonry and wood framing with a 3 hr fire wall separating the two construction types. A 5100 sq. ft. portion of the masonry building addition will be framed for a future second floor but will be unoccupied attic space only under this permit. Other work includes some demo and remodeling to the existing structure, all site improvements and landscaping per approved plans and attachments, *CUP04-00116 Mod. 3. The entire building new and existing will be fully fire sprinklered and used for area and equipped with a fire alarm system.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/8/20068/9/20068/9/2006APASS
DetailsJim Sly
terry; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
OK for Perm Occ. :)
Code Occupancy Approval8/8/20068/8/20068/8/2006PPASS
DetailsCarol Montgomery
Permanent Occupancy 8/8/20068/8/2006 DONE
Details
BLD-Final4/4/20064/5/20064/5/2006APART
DetailsJim Sly
scott ; Phone #: ###-#### Internet Inspection Request from: Marsha
Still OK for Temp.... OK for Perm Occ when Code Enforc Perms.
FIRE-Final Inspection4/3/20064/4/20064/4/2006APASS
DetailsTroy Cobbley
Life safety finaled
FIRE-Final Inspection3/29/20063/31/20063/31/2006AFAIL
DetailsTroy Cobbley
Sprinkler heads need to be added in the large storage room due to a ceiling being added. Also separations have been added around the riser room that may affect sprinkler coverage.
FIRE-Final Inspection3/17/20063/20/20063/20/2006PFAIL
DetailsTroy Cobbley
The fire alarm permit needs finaled but when that happens the lfie safety can be finaled for this building permit.
FIRE-Sprinkler Rough-in3/10/20063/13/20063/13/2006APASS
DetailsTroy Cobbley
Inspection was for the final for the fire sprinkler permit. See FIR05-00571 for entry
FIRE-Conference3/1/20063/2/20063/2/2006ADONE
DetailsTroy Cobbley
I had a conference with the superintendant and Treasure Valley Fire. Heads will not be required under the beam since it is only 10.5" wide but the sidewall head sprinkler deflectors exceed 6" from the beam/wall and will need to be relocated along both sides of the beams.
BLD-Conference2/24/20062/27/20062/27/2006APASS
DetailsJim Sly
Terry; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
Bldg Constr type changed from V1hr to type Vb and IIIb.
FIRE-Conference2/6/20062/7/20062/7/2006ADONE
DetailsTroy Cobbley
Went over life safety notes that apply to the existing church area.
BLD-Final1/13/20061/13/20061/13/2006PPART
DetailsJim Sly
terry; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
OK for Temp Occ Need perm from Fire and Code Enf.... Need re-insp of struct. after completion of selected areas.
BLD-Final1/6/20061/9/20061/10/2006PNR
DetailsJim Sly
terry ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
FIRE-Final Inspection1/6/20061/9/20061/9/2006APART
DetailsTroy Cobbley
A temporary occupancy was given with Dave Hanneman's permission for the church to occupy the new addition so that work can be completed in the existing area.
BLD-Final1/5/20061/6/20061/6/2006PFAIL
DetailsJim Sly
terry ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
C/N Need to fire block comunication from vert to horiz in Mech and Storage rooms.
FIRE-Final Inspection1/5/20061/6/20061/6/2006AFAIL
DetailsTroy Cobbley
Need signage or painting of the curb when the final happens. Knox key box and occupant load signs need installed for the new addition. Per Dave Hanneman a temp is ok when fire alarm and fire sprinkler is complete in the new addition.
FIRE-Final Inspection1/4/20061/5/20061/5/2006PPART
DetailsTroy Cobbley
The only life safety items looked at so far are the exit signs and emergency lights in the new areas which passed except for the east corridor exit discharge light.
BLD-Framing/Rough-in12/27/200512/28/200512/28/2005APASS
DetailsMike Jordan
ceiling grid inspection//Terry; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. hallways, classrooms, kithcen, and offices.
BLD-Energy code compliance10/17/200510/18/200510/18/2005APASS
DetailsMike Jordan
terry; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Also reviewed UL listings for penetrations in 3hr. cmu wall.
BLD-Framing/Rough-in10/11/200510/12/200510/12/2005APASS
DetailsJim Sly
terry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
OK to Insul....See previous notes
BLD-Framing/Rough-in10/4/200510/5/200510/5/2005APART
DetailsJim Sly
terry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Walk thru......Fireblock all dropped ceiling areas.. seal plate penitrations.... firestop all Penitrations and Constr joints in 3hr wall... Provide listed assemblies. OK to insulate.
BLD-Framing/Rough-in9/16/20059/16/20059/16/2005PNR
DetailsTom Arcoraci
terry ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Conference9/13/20059/13/20059/13/2005PPASS
DetailsJim Sly
terry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Walk thru with Contr
BLD-Conference9/12/20059/12/20059/12/2005PCANC
DetailsJim Sly
terry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Conference8/15/20058/16/20058/16/2005ADONE
DetailsTroy Cobbley
Spoke to contractor about options for relocating the underground supply stub-in
BLD-Foundation5/20/20055/23/20055/23/2005APART
DetailsJim Sly
terry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore W. Wall next to existing bldg OK. 5/23/2005 9:50:57 AM
BLD-Footing5/19/20055/20/20055/20/2005APASS
DetailsJim Sly
terry ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie W. Wall by existing bldg. Epoxy dowels OKd by special insp. 5/20/2005 11:37:36 AM
BLD-Foundation5/19/20055/20/20055/20/2005APASS
DetailsJim Sly
terry ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie E. wall... next to existing. Epoxy dowels appr by special insp. 5/20/2005 11:38:39 AM
BLD-Foundation5/18/20055/18/20055/18/2005PPART
DetailsJim Sly
terry; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Footing at East wall next to existing bldg and completion of North wall new bldg ok. 5/18/2005 5:06:32 PM
BLD-Foundation5/16/20055/17/20055/17/2005PPART
DetailsJim Sly
terry; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa East, West and part of North and center walls OK. Stapley Engineering provided fix....and Terricon completed special inspection for epoxy dowels (verts) 5/17/2005 3:32:46 PM
BLD-Foundation5/13/20055/16/20055/16/2005ANR
DetailsJim Sly
terry ###-#### Still waiting for Engineering Contr to fix, and special insp for any epoxy doweling. 5/16/2005 10:54:01 AM
BLD-Footing5/13/20055/13/20055/13/2005PFAIL
DetailsJim Sly
terry; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa #5 verticals not exposed enough above top of footing to allow for 40 diameter lap (16 to 22".... most 17") Engineer to provide fix...Do not pour. 5/16/2005 10:51:16 AM 5/16/2005 10:52:17 AM
BLD-Foundation5/12/20055/13/20055/13/2005PCANC
DetailsJim Sly
TERRY; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles--cancel & reschedule
BLD-Footing5/10/20055/10/20055/10/2005PPASS
DetailsJim Sly
terry; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa