FIRE-Final Inspection | 4/15/2005 | 4/18/2005 | 4/18/2005 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled
|
BLD-Final | 4/15/2005 | 4/18/2005 | 4/18/2005 | P | PASS |
Troy James
|
|
|
darrin; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
Permanent Occupancy | | 4/18/2005 | 4/18/2005 | | DONE |
|
|
|
|
FIRE-Final Inspection | 4/14/2005 | 4/15/2005 | 4/15/2005 | A | FAIL |
Troy Cobbley
|
|
|
Need to provide signage per IFC 608.6 and seismic bracing per 608.7
|
BLD-Final | 4/14/2005 | 4/15/2005 | 4/15/2005 | P | CANC |
Tony Young
|
|
|
darrin; Phone #: ###-#### Internet Inspection Request from: Barbara Moore DARRIN CNCL
|
FIRE-Final Inspection | 4/13/2005 | 4/14/2005 | 4/14/2005 | P | FAIL |
Troy Cobbley
|
|
|
Need information about batteries and generator resubmitted per the fire dept review comments.
|
BLD-Framing/Rough-in | 4/4/2005 | 4/5/2005 | 4/5/2005 | A | PASS |
Jim Sly
|
|
|
darrin-- ceiling grid; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie--call 1st before insp M.G. W. Emerald L Kimball Conc tilt up on R. 4/5/2005 11:15:53 AM
|
BLD-Framing/Rough-in | 2/21/2005 | 2/22/2005 | 2/22/2005 | P | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 2/21/2005 at 1:48:12 PM. Contact: ###-####.
walls ok for cover, both ends of bldg 2/22/2005 3:32:40 PM
|