BLD-Final | 2/22/2006 | 2/22/2006 | 2/22/2006 | P | PASS |
Jim Storey
|
|
|
Tim; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
Code Occupancy Approval | 2/9/2006 | 2/9/2006 | 2/9/2006 | P | PASS |
Dena Gambrel
|
|
|
|
Permanent Occupancy | | 2/9/2006 | 2/9/2006 | | DONE |
|
|
|
|
BLD-Final | 2/3/2006 | 2/6/2006 | 2/6/2006 | A | FAIL |
Jim Storey
|
|
|
Jim -- for permanent occupancy; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Aging Inspection | 1/30/2006 | 1/30/2006 | 2/3/2006 | | FAIL |
Jim Storey
|
|
|
notafied to requist final insp. provide all docs.
|
FIRE-Final Inspection | 11/28/2005 | 11/29/2005 | 11/30/2005 | A | PASS |
Forrest France
|
|
|
Fire life safety approved on 6/13/05.
|
FIRE-Final Inspection | 11/22/2005 | 11/23/2005 | 11/23/2005 | A | CANC |
Forrest France
|
|
|
No time available for this inspection today, to be rescheduled per agreement.
|
BLD-Aging Inspection | 11/14/2005 | 11/14/2005 | 11/14/2005 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Aging Inspection | 9/12/2005 | 9/12/2005 | 9/12/2005 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Foundation | 7/11/2005 | 7/11/2005 | 7/11/2005 | P | PASS |
Jim Storey
|
|
|
robert; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Footing | 7/7/2005 | 7/7/2005 | 7/7/2005 | P | PASS |
Jim Storey
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
FIRE-Final Inspection | 6/13/2005 | 6/13/2005 | 6/13/2005 | P | PASS |
Forrest France
|
|
|
Fire life safety passed inspection. Sign off card for CO not available on site at the time of inspection, notified the general contractor.
|
BLD-Final | 6/9/2005 | 6/10/2005 | 6/10/2005 | P | NR |
Jim Storey
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
FIRE-Final Inspection | 6/9/2005 | 6/10/2005 | 6/10/2005 | A | FAIL |
Forrest France
|
|
|
Provide building address numbers of approved size, provide documentation of current annual inspection on existing fire sprinkler systems in the attatched building, provide fire ext. at bay door as shown on plans.
|
BLD-Conference | 4/13/2005 | 4/14/2005 | 4/14/2005 | A | PASS |
Jim Storey
|
|
|
scott --call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylieresubmit accessable route.
|
BLD-Footing | 4/13/2005 | 4/13/2005 | 4/13/2005 | P | PART |
Tom Arcoraci
|
|
|
re-bar slab inspection please///jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore si 4/13/2005 2:06:27 PM
|
BLD-Foundation | 3/23/2005 | 3/24/2005 | 3/24/2005 | P | PART |
Jim Storey
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore si 3/24/2005 2:06:31 PM
|
BLD-Footing | 3/15/2005 | 3/17/2005 | 3/17/2005 | A | PASS |
Jim Storey
|
|
|
Jim; Phone #: ###-#### Internet Inspection Request from: Jan Rice rebar ok pending special insp. report.
|