BLD-Final | 8/10/2005 | 8/10/2005 | 8/10/2005 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 8/10/2005 at 10:04:09 AM. Contact: ###-####.
|
Code Occupancy Approval | 8/10/2005 | 8/10/2005 | 8/10/2005 | P | PASS |
Dena Gambrel
|
|
|
|
Permanent Occupancy | | 8/9/2005 | 8/9/2005 | | DONE |
|
|
|
|
FIRE-Final Inspection | 8/5/2005 | 8/5/2005 | 8/5/2005 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
FIRE-Final Inspection | 8/4/2005 | 8/4/2005 | 8/4/2005 | P | FAIL |
Forrest France
|
|
|
Provide building street address numbers per plan review note # 1, repair exit discharge light at basement level, provide max occupant load sign in assembly area per note # 8, mount provided fire ext. in basement as discussed, repair remote annunciators at first floor level and test all HVAC detectors.
|
BLD-Other | 6/22/2005 | 6/24/2005 | 6/24/2005 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/22/2005 at 7:55:37 AM. Contact: ###-####.ceilling ok fire stopping misc repair and fd access
|
BLD-Framing/Rough-in | 5/6/2005 | 5/9/2005 | 5/9/2005 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 5/6/2005 at 4:20:17 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 5/5/2005 | 5/6/2005 | 5/6/2005 | A | CANC |
Jim Storey
|
|
|
late am please////JR; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 5/4/2005 | 5/5/2005 | 5/5/2005 | P | CANC |
Jim Storey
|
|
|
prefer late please///jr; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Aging Inspection | 5/3/2005 | 5/3/2005 | 5/3/2005 | | PASS |
Jim Storey
|
|
|
wip
|