Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD04-02988
StatusFinaled
Name KEPHA CONSTRUCTION
Site Address 1151 W MILLER ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(SMARC LLC, IDX PATHOLOGY) To remodel an 11,803 sq.ft. area consisting of warehouse (8,532 s.f.) & office (3,271 s.f.) for use as medical office & laboratory per approved plans. Work includes selective demolition; construction of new interior walls to create offices, reception, customer service, conference, support and laboratory work areas; two new fully accessible restrooms; new entry vestibule, south side egress & access door / landings / stairs / rails, upgrade of entries 108 & 111, two new glazed openings with steel canopies on exterior side above them all; change out of existing windows along alley; fur-out, insulate and finish of interior side of exterior walls for energy code compliance; exterior framing to extend height of parapets, add framing for new cornice on north & west walls and application of new EIFS system per plans; interior finishes and millwork; and to upgrade electrical, plumbing and mechanical to meet tenant needs and comply with current adopted codes and ordinances. Work also includes modifications to the existing parking lot to allow for new landscaping - DRH03-00110. 5/17/05 - After this permit was issued permits for Service Main for Sprinkler System (FIR05-00206); Fire Supression System (FIR05-00282) and additional Fire Alarm System (FIR05-00294) where applied for. The building is now classified as being fully sprinklered. (drs)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/25/20057/26/20057/26/2005APASS
DetailsTony Young
ryan; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
ok for c of o,, (permanent)
FIRE-Final Inspection7/25/20057/25/20057/26/2005PFAIL
DetailsForrest France
Repair exit discharge lighting.
FIRE-Final Inspection7/26/20057/26/20057/26/2005APASS
DetailsForrest France
Fire life safety finaled.
FIRE-Final Inspection7/21/20057/22/20057/22/2005AFAIL
DetailsForrest France
Related fire sprinkler and fire alarm permits must be scheduled, inspected, and approved prior to BLD life safety sign-off. Defficient life safety items include but are not limited to; repair non-functional emergency lights and exit signs, verify functionality of duct smoke detectors, provide building address, provide approved hardware at custodial room.
BLD-Final7/21/20057/22/20057/22/2005ANR
DetailsTony Young
Scheduled by a contractor via Hello! on 7/21/2005 at 4:20:24 PM. Contact: ###-####.
Code Occupancy Approval7/22/20057/22/20057/22/2005APASS
DetailsWm. Michael Meloy
Compliance met.
Permanent Occupancy 7/22/20057/22/2005 DONE
Details
BLD-Other4/28/20054/29/20054/29/2005APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/28/2005 at 3:19:15 PM. Contact: ###-####. ext wall insulation ok area with steel stud walls
BLD-Framing/Rough-in4/21/20054/22/20054/22/2005APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/21/2005 at 12:36:45 PM. Contact: ###-####.ok to cover int walls ok to insulate ext walls 4/22/2005 10:19:55 AM