BLD-Final | 5/31/2005 | 6/1/2005 | 6/1/2005 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/31/2005 at 1:08:10 PM. Contact: ###-####.ok for temp occ ok for perm after fire gos perm
|
FIRE-Final Inspection | 5/31/2005 | 6/1/2005 | 6/1/2005 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
Permanent Occupancy | | 6/1/2005 | 6/1/2005 | | DONE |
|
|
|
|
BLD-Final | 5/26/2005 | 5/26/2005 | 5/27/2005 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/24/2005 at 2:40:53 PM. Contact: ###-####.
|
BLD-Final | 5/24/2005 | 5/25/2005 | 5/27/2005 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/24/2005 at 2:40:53 PM. Contact: ###-####. needs fire l/f signoff
|
FIRE-Final Inspection | 5/27/2005 | 5/27/2005 | 5/27/2005 | P | PART |
Forrest France
|
|
|
Fire life safety OK. Final pending water curtain at exit discharge basement level. Temp. occupancy given for first floor only, basement NOT to be occupied per Sam Rogers.
|
BLD-Final | 5/20/2005 | 5/23/2005 | 5/24/2005 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/20/2005 at 4:19:04 PM. Contact: ###-####.needs other trades finaled first
|
FIRE-Final Inspection | 5/20/2005 | 5/23/2005 | 5/23/2005 | P | CANC |
Forrest France
|
|
|
Duplicate inspection, was meant for alarms already called in, per Dave GC.
|
FIRE-Alarm Testing | 5/20/2005 | 5/23/2005 | 5/23/2005 | A | FAIL |
Forrest France
|
|
|
Fail inspection, alarm and fire sprinkler need inspection and sign-off prior to bld. permit final. This inspection was for life safety final, of which several outstanding issues still need addresed.
|
BLD-Wall cover | 4/14/2005 | 4/14/2005 | 4/14/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/14/2005 at 7:41:44 AM. Contact: ###-####. shaft around evev and mec ok to cover 4/14/2005 4:27:19 PM
|
BLD-Framing/Rough-in | 4/5/2005 | 4/5/2005 | 4/5/2005 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/5/2005 at 10:17:49 AM. Contact: ###-####.soffites need to be self supporting 4/5/2005 3:17:01 PM
|
BLD-Framing/Rough-in | 3/28/2005 | 3/29/2005 | 3/29/2005 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/28/2005 at 1:40:28 PM. Contact: ###-####.walls ok to cover 3/29/2005 9:57:09 AM
|