Permit Information
Permit NumberBLD05-00057
StatusFinaled
Name COLLIER'S INTERNATIONAL
Site Address 4619 W EMERALD ST
Project NameCONTINENTAL PLAZA
Customer Number 
ePlanReviewNo
Description
(HOLLAND REALTY)(CONTINENTAL PLAZA-STE 103) To remodel an existing office space for new tenant per approved plans. First floor is 1,778 sq.ft. of office and basement is 1,224 sq.ft. of storage. Work to include remodel of basement and first floor, upgrading restroom for accessibility, installation of new threshold at entry door, removal of interior paritions, construction of new partitions, installation of new handrails on existing stairs, miscelaneous related interior finishes. (Rmh) PLAN MODIFICATION (5/13/05) Architect has removed partition that divided space, modified office areas and removed training room to create one open office space. (RMH)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection6/16/20056/16/20056/16/2005PPASS
DetailsTroy Cobbley
fire life safety finaled
BLD-Final6/16/20056/16/20056/16/2005PFAIL
DetailsTom Arcoraci
bill; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa cn posted
BLD-Final6/16/20056/16/20056/16/2005PPASS
DetailsTom Arcoraci
ok for perm
Permanent Occupancy 6/16/20056/16/2005 DONE
Details
FIRE-Conference6/15/20056/15/20056/15/2005PDONE
DetailsTroy Cobbley
###-####; I clarified door hardware requirements with contractor.
BLD-Final6/2/20056/3/20056/3/2005ANR
DetailsMike Jordan
bill; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
FIRE-Final Inspection6/2/20056/3/20056/3/2005AFAIL
DetailsTroy Cobbley
Remove manual flush bolts. See IFC 1008.1.8.4 and provide approved door hardware on all doors. See IFC 1008.1.8 and 1008.1.8.1
BLD-Final4/19/20054/19/20054/21/2005PNR
DetailsJim Storey
bill --call 1st before insp --pending fire fn ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie no insp. pending fire
FIRE-Final Inspection4/19/20054/19/20054/19/2005PFAIL
DetailsTroy Cobbley
Revised approved plans not on site
BLD-Framing/Rough-in2/23/20052/24/20052/24/2005ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! ###-#### - bill Note: please call 1/2 hr prior to inspection on 2/23/2005 at 11:27:24 AM.
BLD-Framing/Rough-in2/23/20052/24/20052/24/2005APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/23/2005 at 11:27:24 AM. ada mens restroom ok to cover 2/24/2005 9:00:09 AM