BLD-Final | 10/4/2006 | 10/5/2006 | 10/5/2006 | A | DONE |
Dave Hannah
|
|
|
don; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD-Final | 10/5/2006 | 10/5/2006 | 10/5/2006 | P | PASS |
Dave Hannah
|
|
|
don; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
DOC - Permit Finaled | 10/5/2006 | 10/5/2006 | 10/5/2006 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Grading Inspection | 10/5/2006 | 10/5/2006 | 10/5/2006 | | DONE |
|
|
|
The rough grading and drainage has been completed. However, revegetation and the drainage ponds have not been completed. For this the engineer has recommended a bond of $4,000.00. Upon receipt of this bond the grading and drainage is conditionally approved
|
BLD-Conference | 10/3/2006 | 10/3/2006 | 10/3/2006 | P | DONE |
Dave Hannah
|
|
|
call 1 hour prior to going; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD-Final | 9/29/2006 | 10/2/2006 | 10/2/2006 | A | NR |
Tony Young
|
|
|
don; Phone #: ###-#### Please call gate/garage code Internet Inspection Request from: Cathy Chiles need trades,, hillside,, etc.. phone conf. w/ Don on this
|
BLD-Energy code compliance | 12/7/2005 | 12/8/2005 | 12/8/2005 | A | PART |
Tony Young
|
|
|
don; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa need to finish or justify frame around fireplaces,, also need to re-inspect mech for fireplace
|
BLD-Energy code compliance | 12/5/2005 | 12/6/2005 | 12/6/2005 | P | NR |
Tony Young
|
|
|
don; Phone #: ###-#### Internet Inspection Request from: Barbara Moore need mech pass 1st
|
BLD-Framing/Rough-in | 11/7/2005 | 11/8/2005 | 11/8/2005 | P | PART |
Tony Young
|
|
|
don ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie c/n posted,, ok to insulate,, will need to get more trades
|
BLD-Framing/Rough-in | 11/7/2005 | 11/7/2005 | 11/7/2005 | P | NR |
Tony Young
|
|
|
don//plans on on the main level on top of fireplace; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa need seal pack,, finish framing around b-vent,, etc
|
BLD-Framing/Rough-in | 8/17/2005 | 8/18/2005 | 8/18/2005 | P | PART |
Mike Jordan
|
|
|
shear wall//don; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. All hold downs in place as per plans. All strapping in place and nailed as per plans. TONY- Check your box for the paper work approving the use og staples, 36 guage used 1 7/8 inches long. Gave ok to cover based on what contractor noted and noting that the patern was still over what he had noted. Paper work should be faxed by 8-19-05. Also had paper work on site.
|
BLD-Framing/Rough-in | 8/12/2005 | 8/15/2005 | 8/15/2005 | A | FAIL |
Tony Young
|
|
|
shear wall//call for access code for gate//don; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa need letter from structural engineer on " OK AS BUILT" or do as plans,, lots of detail,,, conf. only
|
BLD-Framing/Rough-in | 5/2/2005 | 5/3/2005 | 5/3/2005 | A | PART |
Tony Young
|
|
|
under floor inspection//don; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
wip on underfloor,, point loads in/ marked 5/3/2005 12:26:51 PM
|
BLD-Footing | 4/5/2005 | 4/6/2005 | 4/6/2005 | A | PART |
Tony Young
|
|
|
don ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Grading Inspection | 4/4/2005 | 4/4/2005 | 4/4/2005 | | DONE |
|
|
|
footing subgrade approved by the geotyechnical engineer
|