Permanent Occupancy | | 5/12/2005 | 5/12/2005 | | DONE |
|
|
|
|
BLD-Final | 5/2/2005 | 5/2/2005 | 5/2/2005 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/2/2005 at 11:21:06 AM. Contact: ###-####. ok for prem occ
|
FIRE-Final Inspection | 5/2/2005 | 5/2/2005 | 5/2/2005 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety, fire alarm and fire sprinkler finaled
|
FIRE-Final Inspection | 4/29/2005 | 4/29/2005 | 4/29/2005 | P | CANC |
Troy Cobbley
|
|
|
Contact: ###-####. One of the fire sprinkler permits shows in review status. No inspection done
|
BLD-Conference | 4/12/2005 | 4/13/2005 | 4/12/2005 | A | CANC |
Troy James
|
|
|
Internet Inspection Request from: Chris Schmidt Inspection cancelled from web by: Chris Schmidt
|
BLD-Framing/Rough-in | 3/14/2005 | 3/14/2005 | 3/14/2005 | P | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 3/14/2005 at 9:07:24 AM. Contact: ###-####. Need architect to provide approved design for corridor wall assembly at I beam, ok to cover walls 3/14/2005 2:27:19 PM
|