BLD-Final | 9/6/2005 | 9/6/2005 | 9/6/2005 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 9/6/2005 at 7:51:08 AM. Contact: ###-####. Final ok.
|
FIRE-Final Inspection | 8/31/2005 | 8/31/2005 | 8/31/2005 | P | PASS |
Forrest France
|
|
|
Fire life safety is satisfactory.
|
FIRE-Final Inspection | 8/29/2005 | 8/29/2005 | 8/29/2005 | P | FAIL |
Forrest France
|
|
|
Remove locking hardware at SW door, provide additional fire extinguisher as discussed.
|
FIRE-Final Inspection | 8/25/2005 | 8/26/2005 | 8/26/2005 | P | CANC |
Forrest France
|
|
|
Spoke with Steve to reschedule inspection for Monday the 29th.
|
Code Occupancy Approval | 8/26/2005 | 8/26/2005 | 8/26/2005 | P | PASS |
Scott M.Brown
|
|
|
OK FINAL SIGNED OFF
|
BLD-Final | 8/25/2005 | 8/25/2005 | 8/25/2005 | P | NR |
Jim Sly
|
|
|
please call 15 min prior to meet///steve; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa Talked to Steve K2......He needs Fire Life/Safety and Zoning signed off.......and Final affidavit from Special insp agency for structural CMU, welding, epoxy, etc.
|
BLD-Aging Inspection | 7/28/2005 | 7/28/2005 | 7/28/2005 | | NR |
Jim Sly
|
|
|
Called....WIP
|