BLD-Final | 10/11/2005 | 10/12/2005 | 10/12/2005 | A | PASS |
Jim Sly
|
|
|
terry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore C/C issued
|
DOC - Permit Finaled | 10/12/2005 | 10/12/2005 | 10/12/2005 | P | PASS |
Jim Sly
|
|
|
C/C issued
|
BLD-Final | 9/29/2005 | 9/30/2005 | 9/30/2005 | A | NR |
Jim Sly
|
|
|
terry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Need Letter from Eng addressing discrepancies per special insp final report. and Fire/life safety final.
|
BLD-Final | 9/28/2005 | 9/28/2005 | 9/28/2005 | P | NR |
Mike Jordan
|
|
|
terry; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
FIRE-Final Inspection | 8/23/2005 | 8/24/2005 | 8/24/2005 | A | PASS |
Forrest France
|
|
|
Fire life safety passed inspection.
|
FIRE-Final Inspection | 8/19/2005 | 8/19/2005 | 8/19/2005 | P | CANC |
Troy Cobbley
|
|
|
jamal; Phone #: ###-####
|
Code Occupancy Approval | 8/19/2005 | 8/19/2005 | 8/19/2005 | P | FAIL |
Carol Montgomery
|
|
|
Landscape at the se corner of the building needs to be replaced/reworked. Also need to have a gate on the trash enclosure.
|
FIRE-Final Inspection | 8/17/2005 | 8/18/2005 | 8/18/2005 | P | FAIL |
Troy Cobbley
|
|
|
Provide the correct remote annunciators for the duct smoke detectors and turn the sample tubes per the manufacturers recommendations into the airstream for proper sampling.
|
BLD-Wall cover | 8/3/2005 | 8/4/2005 | 8/4/2005 | A | PASS |
Jim Sly
|
|
|
###-#### - GIL NOTE: CEILING grid ok
|
BLD-Framing/Rough-in | 8/1/2005 | 8/1/2005 | 8/1/2005 | P | NR |
Jim Sly
|
|
|
###-#### - GIL NOTE: CEILING NR
|
BLD-Framing/Rough-in | 6/15/2005 | 6/15/2005 | 6/15/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/15/2005 at 7:29:49 AM. Contact: ###-####. Framing at Ext walls OK.
|
BLD-Framing/Rough-in | 6/2/2005 | 6/3/2005 | 6/3/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/2/2005 at 12:40:38 PM. Contact: ###-####. Welding completed and special insp done on front Canopy.
|
BLD-Framing/Rough-in | 5/31/2005 | 6/1/2005 | 6/1/2005 | P | FAIL |
Jim Sly
|
|
|
per your request Internet Inspection Request from: Letitia Mesa C/N... Connection of vertical studs at awning (front) to cantilevered roof to be welded, not shot on. See S-2 detail 15.
|
BLD-Framing/Rough-in | 5/31/2005 | 5/31/2005 | 5/31/2005 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/31/2005 at 9:54:28 AM. Contact: ###-####. re-call for frame insp when all trades approved.
|
BLD-Conference | 4/20/2005 | 4/20/2005 | 4/20/2005 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/20/2005 at 8:57:48 AM. Contact: ###-####. looked at re-submittal that they would like me to approve for changes in restroom locations and additional restroom added. 4/20/2005 4:11:33 PM
|
BLD-Footing | 4/8/2005 | 4/12/2005 | 4/12/2005 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/8/2005 at 9:42:35 AM. Contact: ###-####. Footing OK pending MTI special insp, tests, and approvals. 4/12/2005 10:37:46 AM
|
BLD-Conference | 4/8/2005 | 4/8/2005 | 4/8/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/8/2005 at 9:33:06 AM. Contact: ###-####. Met with Gil.....Next to Albertsons. 4/8/2005 2:57:15 PM
|