BLD-Final | 3/9/2006 | 3/9/2006 | 3/9/2006 | P | PASS |
Dave Hannah
|
|
|
herschel; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
DOC - Permit Finaled | 3/9/2006 | 3/9/2006 | 3/9/2006 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 2/28/2006 | 3/1/2006 | 3/2/2006 | P | FAIL |
Dave Hannah
|
|
|
Herschol; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong temp glass at master bath fire doors at garage post address handrail front steps
|
BLD-Grading Inspection | 3/1/2006 | 3/1/2006 | 3/1/2006 | | BOND |
|
|
|
The grading and drainage is complete. However, revegetation has not been completed and for this a $500.00 bond is recommended. Upon receipt of this bond the grading and drainage is conditionally approved.
|
BLD-Final | 2/23/2006 | 2/24/2006 | 2/24/2006 | P | NR |
Dave Hannah
|
|
|
hershal or diane; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa needs terrys sign off
|
BLD-Energy code compliance | 8/24/2005 | 8/25/2005 | 8/25/2005 | A | PASS |
Dave Hannah
|
|
|
nordhaus; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Framing/Rough-in | 8/21/2005 | 8/22/2005 | 8/22/2005 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 8/21/2005 at 8:09:04 PM. Contact: ###-####.
|
BLD-Conference | 8/19/2005 | 8/19/2005 | 8/19/2005 | P | DONE |
Dave Hannah
|
|
|
herschol; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Framing/Rough-in | 7/18/2005 | 7/19/2005 | 7/19/2005 | A | PASS |
Jim Storey
|
|
|
herschol--shear wall ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylieexter brace panels ok
|
BLD-Foundation | 4/13/2005 | 4/14/2005 | 4/14/2005 | A | PASS |
Troy James
|
|
|
darin; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Footing | 3/30/2005 | 3/31/2005 | 3/31/2005 | P | PART |
Troy James
|
|
|
darin; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
wip 3/31/2005 2:17:11 PM
|
BLD-Grading Inspection | 3/31/2005 | 3/31/2005 | 3/31/2005 | | DONE |
Jim Storey
|
|
|
Footing subgrade was approved by the geotechnical engineer on 3/22/05
|
BLD-Grading Inspection | 3/22/2005 | 3/22/2005 | 3/22/2005 | | CANC |
Troy James
|
|
|
Footing subgrade approved by the geotech
|