BLD-Final | 3/3/2006 | 3/3/2006 | 3/3/2006 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/3/2006 at 7:53:21 AM. Contact: ###-####.
|
DOC - Permit Finaled | 3/3/2006 | 3/3/2006 | 3/3/2006 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 2/22/2006 | 2/23/2006 | 2/24/2006 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/22/2006 at 3:20:31 PM. Contact: ###-####. needs handrail on stairs into kitchen and close risers finish handrail and gaurdrail on stair off back pourch
|
BLD-Grading Inspection | 2/16/2006 | 2/16/2006 | 2/16/2006 | | BOND |
|
|
|
Rough grading is complete however fine grading and restoration of the disturbed hillside must still be done. For this a $250.00 bond is required. Upon receipt of this bond the grading and drainage is conditionally approved.
|
BLD-Wall cover | 11/15/2005 | 11/16/2005 | 11/16/2005 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/15/2005 at 2:59:48 PM. Contact: ###-####. insulation ok ok to cover
|
BLD-Framing/Rough-in | 11/11/2005 | 11/14/2005 | 11/14/2005 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/11/2005 at 1:31:04 PM. Contact: ###-####. ok to insulate back side shear also ok to cover
|
BLD-Framing/Rough-in | 11/8/2005 | 11/9/2005 | 11/9/2005 | P | PART |
Dave Hannah
|
|
|
shear wall inspection//bob; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok to cover front and sides but need engineer to review hold downs on back of house wrong size installed and fl/fl strapes need to finaish nailing
|
BLD-Framing/Rough-in | 10/28/2005 | 10/31/2005 | 10/31/2005 | A | FAIL |
Dave Hannah
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa c/n on site do not insulate
|
BLD-Foundation | 9/1/2005 | 9/2/2005 | 9/2/2005 | A | PART |
Dave Hannah
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Barbara Moore remainder of garage wall
|
BLD-Footing | 8/30/2005 | 8/31/2005 | 9/1/2005 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/30/2005 at 4:47:28 PM. Contact: ###-####.
|
BLD-Foundation | 8/31/2005 | 8/31/2005 | 9/1/2005 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/31/2005 at 7:54:28 AM. Contact: ###-####.
|
BLD-Foundation | 7/28/2005 | 7/29/2005 | 7/29/2005 | A | PASS |
Jim Storey
|
|
|
dustin; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Concrete | 7/22/2005 | 7/25/2005 | 7/25/2005 | A | PASS |
Mike Jordan
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 7/22/2005 | 7/25/2005 | 7/25/2005 | A | PASS |
Mike Jordan
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 7/20/2005 | 7/22/2005 | 7/22/2005 | A | NR |
Tony Young
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles will recall for monday am
|
BLD-Footing | 7/12/2005 | 7/12/2005 | 7/12/2005 | P | PASS |
Mike Jordan
|
|
|
stem wall and footing ok to do per Dave Hannah. All rebar in place as per approved plans. Lower portion only as per Terry Records.
|
BLD-Footing | 6/29/2005 | 6/30/2005 | 6/30/2005 | A | PART |
Dave Hannah
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok to pour first area
|