Code Occupancy Approval | | | 9/28/2007 | | DONE |
Carol Montgomery
|
|
|
Signed off - Final - All requirements have been met.
|
BLD-Final | 5/31/2007 | 5/31/2007 | 5/31/2007 | P | PASS |
Mike Jordan
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. All issues have been resolved. Will be ok for perm occ. once code enforcement finals.
|
BLD-Final | 5/29/2007 | 5/30/2007 | 5/30/2007 | P | PART |
Mike Jordan
|
|
|
john ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. ok for temp occ. Stairway issue to managers office. Not wide enough. Agreed to temp if office was not used until stairs are fixed.
|
FIRE-Final Inspection | 5/29/2007 | 5/30/2007 | 5/30/2007 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. There is no storage of hazardous materials at this time for verification.
|
Code Occupancy Approval Temp | | | 5/24/2007 | | FAIL |
|
|
|
TEMPORARY APPROVED. BOND IN PLACE.
|
FIRE-Conference | 5/21/2007 | 5/21/2007 | 5/21/2007 | P | DONE |
Troy Cobbley
|
|
|
I went over fire extinguisher placement, door hardware and exit sign placement
|
FIRE-Final Inspection | 5/8/2007 | 5/9/2007 | 5/9/2007 | A | CANC |
Troy Cobbley
|
|
|
After my conversation with John this inspection is to be canceled.
|
BLD-Other | 5/8/2007 | 5/9/2007 | 5/9/2007 | A | PASS |
Mike Jordan
|
|
|
john - ceiling cover; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. ceiling grid ok. Received new details from architect to reflect cicsca standards. Plan was submitted. ok to cover.
|
BLD-Framing/Rough-in | 4/30/2007 | 5/1/2007 | 5/1/2007 | P | FAIL |
Mike Jordan
|
|
|
john Note: ceiling cover ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Ceiling grid not per plan.
|
FIRE-Conference | 4/5/2007 | 4/6/2007 | 4/9/2007 | A | DONE |
Troy Cobbley
|
|
|
I went over the review comments pertaining to the storage of the motor oil
|
BLD-Conference | 4/5/2007 | 4/5/2007 | 4/5/2007 | P | CANC |
Mike Jordan
|
|
|
John; Phone #: ###-#### Internet Inspection Request from: Stacie Backus. Needed fire inspector for conference. Contractor to call back and rechedule.
|
BLD-Framing/Rough-in | 3/7/2007 | 3/8/2007 | 3/8/2007 | A | PASS |
Mike Jordan
|
|
|
John; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
|
BLD-Conference | 1/5/2007 | 1/5/2007 | 1/5/2007 | P | DONE |
Mike Jordan
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Issue with headroom clearance at egress stairway to mezz and with mezz above. contractor to contact architect for possible solutions.
|
BLD-Framing/Rough-in | 1/2/2007 | 1/3/2007 | 1/3/2007 | A | PASS |
Mike Jordan
|
|
|
john ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Interior non load bearing walls at south end of store under new mezz.
|
BLD-Framing/Rough-in | 12/12/2006 | 12/12/2006 | 12/12/2006 | P | PASS |
Mike Jordan
|
|
|
john ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Interior framing and shearnailing on back offices.
|
BLD-Energy code compliance | 12/6/2006 | 12/7/2006 | 12/7/2006 | A | PASS |
Mike Jordan
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. North wall, eastwall 2nd floor, southwall.
|
BLD-Framing/Rough-in | 12/1/2006 | 12/4/2006 | 12/4/2006 | A | PASS |
Mike Jordan
|
|
|
john ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. After meeting with contractor, architect and plan review, it was determined that fire barrier wall is not required under the 2003 non seperated uses condition and buliding will be fire sprinkled. Architect will submit asi to plan review reflecting the changes. Also inspected framing above bowling alley.
|
BLD-Framing/Rough-in | 11/17/2006 | 11/17/2006 | 11/17/2006 | P | PART |
Jim Sly
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles C/N....Arch of record to provide method of firestopping for through penitrations @ 2hr fire barrier wall....of wood truss chords and glue lam beams....Sect 712 2003 IBC
|
BLD-Footing | 10/12/2006 | 10/13/2006 | 10/13/2006 | A | PASS |
Mike Jordan
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. New interior footings and column pad footings for new mezz. Also reinspected added blocxking at shear wall at bowling alley. Verified that putty pads were installed at 2hr seperation wall.
|
FIRE-Conference | 9/26/2006 | 9/26/2006 | 9/26/2006 | P | DONE |
Forrest France
|
|
|
On site confrence to discuss exit signage and door hardware at two locations in the sw corner of the building.
|
BLD-Framing/Rough-in | 9/21/2006 | 9/22/2006 | 9/22/2006 | A | PART |
Mike Jordan
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Framing ast bowling alley(needs to add blocking at shearwall) Interior steel stud framed walls for offices at nw corner of bldg.(ok to insul and rock thisn area) Inspected 2hr seperation wall. Wall is one sided. Contractor needs to provide UL listings for penetrations and ele. needs to install putty pads\ were applkicable.
|
BLD-Footing | 7/26/2006 | 7/26/2006 | 7/26/2006 | P | PASS |
Mike Jordan
|
|
|
john - ###-####. Canopy foundations in north parking lot per supplied engineering. Noted to contractor to double check with planning and zonning to ensure that tent canopies would be allowed in front parkinglot.
|
BLD-Framing/Rough-in | 5/30/2006 | 5/31/2006 | 5/31/2006 | A | PASS |
Mike Jordan
|
|
|
john walker ###-#### Exterior framing for popout panel. As per RFI.
|
BLD-Framing/Rough-in | 5/25/2006 | 5/25/2006 | 5/25/2006 | P | PASS |
Mike Jordan
|
|
|
###-#### - framing steel. exterior stell stud framing at upper portion of bldg. for stucco system.
|
BLD-Framing/Rough-in | 5/12/2006 | 5/15/2006 | 5/15/2006 | P | PASS |
Mike Jordan
|
|
|
###-#### - john Roof framing at new entry. Ok to cover.
|
BLD-Conference | 5/5/2006 | 5/8/2006 | 5/8/2006 | A | DONE |
Mike Jordan
|
|
|
conf only ###-#### John. Meet with John on job site and went over plans, pecial insp reports and reveiwed some of the work done to date and work to be done. Did note that architectual plans did note match with work being done on new roof. Noted to cointractor that he will need to get some as builts and have them approved.
|