BLD-Aging Inspection | 9/27/2006 | 9/27/2006 | 9/27/2006 | | CANC |
Tom Arcoraci
|
|
|
|
DOC - Permit Expired | 9/27/2006 | 9/27/2006 | 9/27/2006 | P | PASS |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 5/18/2006 | 5/19/2006 | 5/19/2006 | P | FAIL |
Troy Cobbley
|
|
|
Contractor intended for the inspection to be for the associated racking permit, BLD05-02880, but I went over the outstanding issues for this permit with him. Dereck stated he would followup on all items and get it finaled. The associated fire alarm permit is not finaled either.
|
BLD-Aging Inspection | 3/9/2006 | 3/9/2006 | 3/9/2006 | | NR |
Tom Arcoraci
|
|
|
on temp
|
BLD-Aging Inspection | 1/2/2006 | 1/2/2006 | 1/3/2006 | | NR |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 10/31/2005 | 10/31/2005 | 10/31/2005 | | PASS |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 8/24/2005 | 8/29/2005 | 8/29/2005 | P | PART |
Forrest France
|
|
|
Temporary occupancy for the office area within scope of work is approved per Jenifer Gililland and Troy Cobbley pending a racking permit for the adjacent warehouse.
|
BLD-Final | 8/18/2005 | 8/19/2005 | 8/19/2005 | P | PART |
Tom Arcoraci
|
|
|
jared ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok for temp needs handrail to return to wall at entry
|
FIRE-Final Inspection | 8/19/2005 | 8/19/2005 | 8/19/2005 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with Jennifer's permission until all items on the correction notice have been corrected.
|
FIRE-Final Inspection | 8/18/2005 | 8/19/2005 | 8/19/2005 | A | FAIL |
Troy Cobbley
|
|
|
Resubmit building plans showing fencing, gates and storage layout for review of the exiting ussues not previously shown on plans. The warehouse area has racks and storage shelves. The top shelf of the racks is at 10'-10". The top of the storage is at 15'-5" and appears to be encapsulated. The top shelf of the storage shelf's is at 8'-9" with the top of the storage at 10'-5 1/2". The storage for both shelfing systems consists of document boxes. Provide annual inspection for the fire extinguishers, provide documentation that the exit signs and exit discharge lighting can be combined and resubmit fire alarm plans/change map at annunciator.
|
FIRE-Final Inspection | 8/17/2005 | 8/18/2005 | 8/18/2005 | A | FAIL |
Troy Cobbley
|
|
|
I went over life safety items with the contractor. No inspection.
|
BLD-Framing/Rough-in | 7/27/2005 | 7/27/2005 | 7/27/2005 | P | PASS |
Tom Arcoraci
|
|
|
derrk --ceiling grid ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok 1st flr as with elec insp
|
BLD-Framing/Rough-in | 6/14/2005 | 6/15/2005 | 6/15/2005 | A | PASS |
Tom Arcoraci
|
|
|
derrick ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 5/5/2005 | 5/6/2005 | 5/6/2005 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 5/5/2005 at 4:22:23 PM. Contact: ###-####. wrong permit called in
|
BLD-Foundation | 4/11/2005 | 4/12/2005 | 4/12/2005 | A | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 4/11/2005 at 5:54:46 PM. Contact: ###-####. no one at building 4/12/2005 10:44:24 AM
|
BLD-Framing/Rough-in | 7/25/2005 | 7/16/2005 | | P | |
Tom Arcoraci
|
|
|
ceiling grid//derrek; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|