Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD05-00364
StatusFinaled
Name CHRIS WILLIAMS (RESIDENTIAL CONDO)
Site Address 420 W MAIN ST Unit: 403
Project NameVELTEX BLDG-4TH FLR
Customer Number 
ePlanReviewNo
Description
(CHRIS WILLIAMS - RESIDENTIAL CONDO - VELTEX BLDG - STE 403) This building is fire sprinklered for story increase. To complete a 2 story residential condominium located on the 4th and 5th stories of the Veltex Building. This unit will have a 2,145 square foot main level (includes the 690 square foot exterior terrace) and a 935 square foot 2nd level. The total floor area of this tenant space will be 3,080 square feet. Work is to include interior nonbearing walls, an interior winder stairway with circular stairway segments, interior doors, and interior finishes. The work shall comply with the approved drawings, the plan review report, and all applicable codes. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/19/20069/19/20069/19/2006PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/19/2006 at 7:46:52 AM. Contact: ###-####.
DOC - Permit Finaled9/19/20069/19/20069/19/2006PPASS
DetailsDave Hannah
BLD-Final9/15/20069/15/20069/15/2006PPART
DetailsDave Hannah
ted; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok for perm occ after elec gos perm
FIRE-Final Inspection9/14/20069/14/20069/14/2006PPASS
DetailsForrest France
Fire life safety is satisfactory, inspection passed.
BLD-Other9/6/20069/7/20069/7/2006ANR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/6/2006 at 12:39:19 PM. Contact: ###-####.
BLD-Framing/Rough-in4/3/20064/3/20064/3/2006APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/3/2006 at 6:59:54 AM. Contact: ###-####.
BLD-Other3/1/20063/1/20063/2/2006PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/1/2006 at 11:17:26 AM. Contact: ###-####. ok to insulate ext walls and int walls
BLD-Conference2/28/20063/1/20063/1/2006APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/28/2006 at 10:53:01 AM. Contact: ###-####.
BLD-Framing/Rough-in1/27/20061/27/20061/30/2006PFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/27/2006 at 9:38:14 AM. Contact: ###-####.needs to fire caulk walls and floor redo wires for sep ceiling grid
BLD-Aging Inspection10/14/200510/14/200510/14/2005 PASS
DetailsDave Hannah