Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD05-00458
StatusFinaled
Name GUHO CORP
Site Address 117 S 6TH ST
Project NameLEKU ONA
Customer Number 
ePlanReviewNo
Description
(LEKU ONA) This building is fire sprinklered for area increase; story increase; to allow the basement to be unenclosed; to allow corridors to be nonrated; and to allow the basement, 1st story, and 2nd story to be open to each other. To convert an existing 6,027 square foot building (2 story with basement) into a restaurant / bar occupancy and to construct a 3,024 square foot addition. Work is to include 6 restrooms accessible to the disabled, an elevator, exterior masonry walls, concrete footings, concrete foundations, stairways, millwork, interior nonbearing walls, interior concrete footings, wood beams, steel beams, wood columns, steel columns, a seismic upgrade, new roof insulation and coverings, and interior finishes. The work shall comply with the approved drawings, structural engineering, and all applicable codes. The fire sprinkler system shall comply with 2002 NFPA 13 as regulated by the Fire Department. DRH04-00027.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/22/200512/22/200512/22/2005PPASS
DetailsDave Hannah
rob; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok for perm occ
BLD-Final12/22/200512/22/200512/22/2005PPASS
DetailsForrest France
The related alarm permit is now finaled, fire life safety completed satisfactory.
Permanent Occupancy 12/22/200512/22/2005 DONE
Details
BLD-Final11/23/200511/23/200511/23/2005PPART
DetailsDave Hannah
rob; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok for temp occ fire is signing off temp as per sam r needs to fix ada signage for restrooms and grab bars over lavs
BLD-Final11/22/200511/23/200511/23/2005ACANC
DetailsDave Hannah
rob; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Final11/18/200511/22/200511/23/2005PCANC
DetailsDave Hannah
rob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
FIRE-Final Inspection11/22/200511/23/200511/23/2005APART
DetailsForrest France
Correction notice items have been completed, fire life safety is acceptable pending testing of the duct smoke detectors for completion of the alarm permit inspection.
FIRE-Final Inspection11/22/200511/23/200511/22/2005ACANC
DetailsForrest France
Duplicate inspection already scheduled.
FIRE-Final Inspection11/22/200511/22/200511/22/2005PPART
DetailsForrest France
Fire alarm must be finaled prior to life safety final approval, items on c/n must be completed as required.
FIRE-Final Inspection11/18/200511/21/200511/21/2005AFAIL
DetailsForrest France
Basement is missing one exit sign as red lined on plans, doors in four locations are equipped with non-approved thumbturn hardware, 1st floor requires one additional fire ext., one discharge emergency light is not installed, hardware at the handicap accessible elevator lobby door is incorrect, need to final sprinkler and alarm permits prior to signature for the life safety.
FIRE-Final Inspection11/18/200511/18/200511/18/2005PCANC
DetailsForrest France
No time for inspection today, need to final alarm and sprinkler permits prior to life safety approval.
BLD-Final11/18/200511/18/200511/18/2005PNR
DetailsJim Storey
rob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Code Occupancy Approval11/3/200511/3/200511/3/2005PDONE
DetailsWm. Michael Meloy
required to place 1" plywood around trees, absent the grates.
Extend Permit 180 days11/3/200511/3/200511/3/2005PDONE
DetailsWm. Michael Meloy
Required to use 1" plywood around planter area, as grates are back ordered. Street lightrs being put in.
BLD-Framing/Rough-in10/24/200510/24/200510/25/2005PPART
DetailsDave Hannah
ceiling insp//rob; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok to cover
BLD-Framing/Rough-in10/21/200510/21/200510/21/2005PFAIL
DetailsMike Jordan
rob///ceiling insepction please; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. Wires still not plumb. One hour construction still in progress under stairway.
BLD-Framing/Rough-in10/19/200510/20/200510/20/2005AFAIL
DetailsDave Hannah
ceiling grid///rob; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa remove rivits plumb wires
BLD-Framing/Rough-in10/10/200510/10/200510/11/2005PPART
DetailsDave Hannah
rob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles back exit ok to cover
BLD-Framing/Rough-in9/9/20059/9/20059/12/2005PPART
DetailsDave Hannah
rob; Phone #: ###-#### Internet Inspection Request from: Barbara Moore one hour lid in back stairway ok to cover
BLD-Framing/Rough-in8/30/20058/30/20058/30/2005PPART
DetailsDave Hannah
rob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles second floor new area ok to cover
BLD-Framing/Rough-in8/24/20058/24/20058/24/2005PPART
DetailsDave Hannah
rob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles roof straps on new part of roor and fire blocking rest room walls
BLD-Framing/Rough-in8/17/20058/17/20058/18/2005PPART
DetailsDave Hannah
rob; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok to start covering int walls
BLD-Conference8/9/20058/10/20058/10/2005ADONE
DetailsDave Hannah
set up for 9:00am??? Larry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in8/9/20058/9/20058/10/2005PPART
DetailsDave Hannah
rob - Note: partial; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles second floor floor straping ok to pour conc
BLD-Framing/Rough-in7/13/20057/13/20057/13/2005PPART
DetailsDave Hannah
sizemic braces inspection///rob; Phone #: ###-#### Internet Inspection Request from: Barbara Moore roof straping ok ok to roof
BLD-Conference7/11/20057/12/20057/12/2005PDONE
DetailsDave Hannah
rob; Phone #: ###-#### Internet Inspection Request from: Barbara Moore rob is taking over project walked project
BLD-Framing/Rough-in6/28/20056/29/20056/29/2005APART
DetailsJim Sly
larry; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
OK to cover Bsmnt Restrooms and Partition walls, main Flr, ( between S entry and dining area).
BLD-Foundation6/28/20056/29/20056/29/2005APASS
DetailsJim Sly
re-bar inspection//larry; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
The remainder of Footings ...... OK
BLD-Footing6/27/20056/28/20056/28/2005ANR
DetailsDave Hannah
larry; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Conference6/21/20056/21/20056/23/2005PPART
DetailsDave Hannah
larry; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles roofing I talked with larry about leaving old single ply and installing new roofing over it told him it was ok with me but to check with his engineer
BLD-Concrete6/20/20056/21/20056/21/2005APART
DetailsDave Hannah
larry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore masonry wall first four ft ok to grout
BLD-Framing/Rough-in6/13/20056/14/20056/14/2005APART
DetailsDave Hannah
re-bar//larry; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok to place basement walls after engingeer ok rebar his detail showed it 1 1/2 inchs off back face crew has it centered
BLD-Foundation6/7/20056/8/20056/9/2005APART
DetailsDave Hannah
larry; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to pour area under old part that was removed
BLD-Footing5/27/20055/27/20055/27/2005PPART
DetailsDave Hannah
larry ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie section in basement along 6th st
BLD-Framing/Rough-in5/19/20055/19/20055/19/2005PPART
DetailsDave Hannah
larry ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylieframing arond nrw stairs basement floor
BLD-Foundation5/16/20055/16/20055/16/2005PPART
DetailsDave Hannah
LARRY; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to pour bac\k wall
BLD-Footing4/20/20054/20/20054/20/2005PPASS
DetailsDave Hannah
larry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Footing4/12/20054/13/20054/13/2005APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/12/2005 at 10:15:15 AM. Contact: ###-####. ftg in basement ok engineer to ok changes 4/13/2005 1:30:34 PM