BLD-Final | 6/29/2005 | 6/29/2005 | 6/30/2005 | P | PASS |
Dave Hannah
|
|
|
###-#### - joe ok for perm occ
|
Permanent Occupancy | | 6/30/2005 | 6/30/2005 | | DONE |
|
|
|
|
BLD-Final | 6/9/2005 | 6/9/2005 | 6/10/2005 | P | NR |
Dave Hannah
|
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
FIRE-Final Inspection | 4/4/2005 | 4/5/2005 | 4/5/2005 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled. Notified Joe that the manual bolts at the main exterior exit need to be removed
|
FIRE-Final Inspection | 4/4/2005 | 4/4/2005 | 4/4/2005 | P | FAIL |
Troy Cobbley
|
|
|
joe ; Phone #: ###-#### Electrical shunt did not reset.
|
BLD-Final | 4/4/2005 | 4/4/2005 | 4/4/2005 | P | CANC |
Dave Hannah
|
|
|
joe ###-#### pending fire fn
|
BLD-Final | 4/1/2005 | 4/4/2005 | 4/4/2005 | A | CANC |
Dave Hannah
|
|
|
joe ###-#### pending fire fn
|
FIRE-Final Inspection | 3/31/2005 | 4/1/2005 | 4/1/2005 | A | PART |
Forrest France
|
|
|
Temp given per Renn Ross per shunt replacement, add emergency light, repair emergency exit light.
|
BLD-Final | 4/1/2005 | 4/1/2005 | 4/1/2005 | P | PART |
Dave Hannah
|
|
|
ok for temp occ needs allother trades to sign final and install hand rails on stairs at back 4/1/2005 3:22:54 PM
|
BLD-Framing/Rough-in | 3/24/2005 | 3/25/2005 | 3/25/2005 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/24/2005 at 2:31:48 PM. wall behind 1hr hood 3/25/2005 11:40:02 AM
|
BLD-Framing/Rough-in | 3/25/2005 | 3/25/2005 | 3/25/2005 | P | PART |
Dave Hannah
|
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Barbara Moore steel stud wall back of hood ok to cover 3/25/2005 3:45:23 PM
|