BLD-Final | 7/14/2005 | 7/15/2005 | 7/15/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/14/2005 at 4:31:19 PM. Contact: ###-####. ok for temp
|
FIRE-Final Inspection | 7/14/2005 | 7/15/2005 | 7/15/2005 | A | PASS |
Forrest France
|
|
|
Fire life safety is satisfactory.
|
FIRE-Final Inspection | 7/14/2005 | 7/14/2005 | 7/14/2005 | P | CANC |
Forrest France
|
|
|
Contact: ###-####. Cancel per Paul, items on correction notice are not completed.
|
FIRE-Final Inspection | 7/12/2005 | 7/13/2005 | 7/13/2005 | P | FAIL |
Forrest France
|
|
|
Remove thumbturn and supply approved door hardware at both main entry/exit doors, provide fire ext. with current annual inspection tag installed with handle no higher than 48" AFF, provide suite address at main entrance.
|
BLD-Final | 7/12/2005 | 7/14/2005 | 7/13/2005 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/12/2005 at 11:50:13 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jul 13 2005 2:15PM.
|
FIRE-Final Inspection | 7/12/2005 | 7/13/2005 | 7/12/2005 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/12/2005 at 11:47:29 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jul 12 2005 11:52AM.
|
BLD-Final | 7/8/2005 | 7/11/2005 | 7/11/2005 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/8/2005 at 12:48:49 PM. Contact: ###-####. needs other trades sign offs
|
BLD-Framing/Rough-in | 5/27/2005 | 5/27/2005 | 5/27/2005 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/27/2005 at 9:47:34 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 5/25/2005 | 5/25/2005 | 5/25/2005 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/25/2005 at 9:13:59 AM. Contact: ###-####.
|