(LENIR LTD)(BELGRAVIA BLDG-2ND FLR) Minor remodel to an existing 916 sq. ft. office condominium on the second floor for a new tenant per approved plans. Work to include a few new interior walls, interior doors, interior finish, plumbing work, and electrical work. Accessibility upgrade work includes providing new 3' wide doors with accessible hardware, new accessible sink and counter in break room, and an accessible handrail on existing stairway. A Certificate of Occupancy is to be issued when completed and approved. NOTE: This building is not fire sprinklered. JCB
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/14/20057/15/20057/15/2005PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/14/2005 at 4:31:19 PM. Contact: ###-####. ok for temp
FIRE-Final Inspection7/14/20057/15/20057/15/2005APASS
DetailsForrest France
Fire life safety is satisfactory.
FIRE-Final Inspection7/14/20057/14/20057/14/2005PCANC
DetailsForrest France
Contact: ###-####. Cancel per Paul, items on correction notice are not completed.
FIRE-Final Inspection7/12/20057/13/20057/13/2005PFAIL
DetailsForrest France
Remove thumbturn and supply approved door hardware at both main entry/exit doors, provide fire ext. with current annual inspection tag installed with handle no higher than 48" AFF, provide suite address at main entrance.
BLD-Final7/12/20057/14/20057/13/2005ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/12/2005 at 11:50:13 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jul 13 2005 2:15PM.
FIRE-Final Inspection7/12/20057/13/20057/12/2005ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/12/2005 at 11:47:29 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jul 12 2005 11:52AM.
BLD-Final7/8/20057/11/20057/11/2005ANR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/8/2005 at 12:48:49 PM. Contact: ###-####. needs other trades sign offs
BLD-Framing/Rough-in5/27/20055/27/20055/27/2005PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/27/2005 at 9:47:34 AM. Contact: ###-####.
BLD-Framing/Rough-in5/25/20055/25/20055/25/2005PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/25/2005 at 9:13:59 AM. Contact: ###-####.