BLD-Final | 2/26/2007 | 2/26/2007 | 2/26/2007 | P | NH |
Dave Hannah
|
|
|
Please check restroom sinks & ada signage & then let me know. Thanks Internet Inspection Request from: Cathy Weisshaupt no access
|
BLD-Final | 2/23/2007 | 2/26/2007 | 2/26/2007 | A | NH |
Dave Hannah
|
|
|
Please check restroom sinks & ada signage & then let me know. Thanks Internet Inspection Request from: Cathy Weisshaupt no access
|
BLD-Final | 2/26/2007 | 2/26/2007 | 2/26/2007 | P | PASS |
Dave Hannah
|
|
|
Please check restroom sinks & ada signage & then let me know. Thanks Internet Inspection Request from: Cathy Weisshaupt
|
Code Occupancy Approval | | | 11/28/2005 | | PASS |
|
|
|
Compliance Met.
|
BLD-Final | 11/25/2005 | 11/25/2005 | 11/25/2005 | P | PART |
Dave Hannah
|
|
|
bill - ###-#### ok for temp occ needs other trades to sign off perm and fix sinks inrestrooms and ada signage
|
FIRE-Final Inspection | 11/25/2005 | 11/25/2005 | 11/25/2005 | P | PART |
Forrest France
|
|
|
Fire life safety is acceptable pending final of the alarm and sprinkler permits for the shell.
|
FIRE-Final Inspection | 11/23/2005 | 11/23/2005 | 11/23/2005 | P | CANC |
Forrest France
|
|
|
No time available for this inspection today, the related fire alarm and sprinkler permits must be finaled prior to life safety approval.
|
FIRE-Final Inspection | 11/22/2005 | 11/23/2005 | 11/23/2005 | A | CANC |
Forrest France
|
|
|
bill ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie///cancelled per Bill w/Cafco will call to reschedule //11/22/05 LEG 4:28pm
|
BLD-Conference | 11/17/2005 | 11/18/2005 | 11/18/2005 | A | PASS |
Jim Storey
|
|
|
everett; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Framing/Rough-in | 9/29/2005 | 9/29/2005 | 9/30/2005 | P | PART |
Dave Hannah
|
|
|
fire caulking in duct shaft///everett; Phone #: ###-#### Internet Inspection Request from: Barbara Moore shaft on second and thrid floors ok to cover ext
|
BLD-Framing/Rough-in | 9/21/2005 | 9/22/2005 | 9/22/2005 | A | NR |
Dave Hannah
|
|
|
shaft walls
|
BLD-Framing/Rough-in | 9/21/2005 | 9/22/2005 | 9/22/2005 | A | NR |
Dave Hannah
|
|
|
shaft wall inspection//everett; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Other | 9/20/2005 | 9/21/2005 | 9/21/2005 | A | NR |
Dave Hannah
|
|
|
Fire calking\###-#### ready after 10:00
|
BLD-Framing/Rough-in | 9/20/2005 | 9/20/2005 | 9/21/2005 | P | PART |
Dave Hannah
|
|
|
everett - fire proofing for steel beans he will call when ready late afternoon; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles theird floor 1hr protection of beam at shaft ok
|
BLD-Other | 9/19/2005 | 9/19/2005 | 9/21/2005 | P | PART |
Dave Hannah
|
|
|
everett - fire proofing for steel beans he will call when ready late afternoon; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles fire proofing first floor beams for shaft opennig ok
|
BLD-Framing/Rough-in | 9/9/2005 | 9/9/2005 | 9/12/2005 | P | PART |
Dave Hannah
|
|
|
steel studs inspection please///everett; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 1st floor restroom area it walls ok to cover but need engineer to ok dome ceiling area lack of detail on plans asto how it sould be framed
|
BLD-Energy code compliance | 9/7/2005 | 9/8/2005 | 9/8/2005 | A | FAIL |
Dave Hannah
|
|
|
bill; Phone #: ###-#### Internet Inspection Request from: Barbara Moore this was for the fire proofing on beams installed for the cut made for the shaft the fire proofing was mixed with sheetrock mud and hand aplyed this is no per anything it fails
|
BLD-Conference | 8/29/2005 | 8/29/2005 | 8/30/2005 | P | PART |
Dave Hannah
|
|
|
###-#### - everett Note: please call 1/2 hr prior to inspection fire protection of project
|
BLD-Conference | 7/26/2005 | 7/27/2005 | 7/27/2005 | A | PASS |
Dixie Fellows
|
|
|
Meet Dave in the garage at 8:20 per your request.......discussed shafts and wrap
|
BLD-Conference | 7/26/2005 | 7/27/2005 | 7/27/2005 | A | PART |
Dave Hannah
|
|
|
Meet Dixie in the garage at 8:20 per her request.......talked about gresse ducts and shafts
|
BLD-Conference | 7/14/2005 | 7/15/2005 | 7/15/2005 | A | DONE |
Dave Hannah
|
|
|
|
BLD-Conference | 7/11/2005 | 7/12/2005 | 7/14/2005 | A | CANC |
Dave Hannah
|
|
|
per Dixie's request////for questions please call her at ###-####
|
BLD-Conference | 7/11/2005 | 7/12/2005 | | A | |
Dixie Fellows
|
|
|
per Dixie's request////for questions please call her at ###-####
|