BLD-Final | 12/1/2005 | 12/1/2005 | 12/1/2005 | P | PASS |
Mike Jordan
|
|
|
nat; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
Permanent Occupancy | | 12/1/2005 | 12/1/2005 | | DONE |
|
|
|
|
FIRE-Final Inspection | 11/21/2005 | 11/21/2005 | 11/21/2005 | P | FAIL |
Troy Cobbley
|
|
|
Life safety can be finaled when the fire alarm permit is done.
|
BLD-Other | 11/10/2005 | 11/14/2005 | 11/14/2005 | A | CANC |
Mike Jordan
|
|
|
natt Note: racking; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Notified by permit desk of cancellation.
|
BLD-Conference | 10/4/2005 | 10/4/2005 | 10/4/2005 | P | DEFR |
Jim Sly
|
|
|
ned; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Told Nat that he needs to meet with the Architect on site to review all ADA requirements......Lot of elements not per appr plan. ie. door swings. tactile signs etc.
|
FIRE-Final Inspection | 8/17/2005 | 8/17/2005 | 8/17/2005 | P | FAIL |
Troy Cobbley
|
|
|
Provide knox key box per note #9. Provide painting or signage per note #11. Provide exit discharge lighting per note #5. Provide approved door hardware per notes #14 and #15. Repair the fire alarm panel and provide the requirements of note #24. Provide clear path of travel, non locking hardware, through doors with exit signs or meet with plan review to possibley remove exit signs.
|
BLD-Framing/Rough-in | 7/26/2005 | 7/26/2005 | 7/26/2005 | P | PASS |
Mike Jordan
|
|
|
stairs//matt; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Framing/Rough-in | 7/25/2005 | 7/26/2005 | 7/26/2005 | A | FAIL |
Mike Jordan
|
|
|
stairs//tim; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. City approved plans not on site.
|