BLD-Final | 6/14/2006 | 6/14/2006 | 6/14/2006 | P | PASS |
Dave Hannah
|
|
|
Derek, please call 1st for access; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
DOC - Permit Finaled | 6/14/2006 | 6/14/2006 | 6/14/2006 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 6/13/2006 | 6/13/2006 | 6/13/2006 | P | FAIL |
Dave Hannah
|
|
|
Derek; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles needs elec final needs smoke dectors needs handrails with returns ok to leave second floor area unfinish if all other trades can final
|
BLD-Final | 6/12/2006 | 6/13/2006 | 6/13/2006 | A | DEFR |
Dave Hannah
|
|
|
Derek; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Conference | 3/9/2006 | 3/9/2006 | 3/10/2006 | P | PART |
Dave Hannah
|
|
|
derrick -call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie hand rail on outside front stairs
|
BLD-Energy code compliance | 12/9/2005 | 12/12/2005 | 12/12/2005 | A | PASS |
Dave Hannah
|
|
|
derek; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Framing/Rough-in | 12/5/2005 | 12/5/2005 | 12/5/2005 | P | PASS |
Dave Hannah
|
|
|
derrick; Phone #: ###-#### Internet Inspection Request from: Barbara Moore all c/n itims are complete seal package is in ok to insulate
|
BLD-Framing/Rough-in | 12/1/2005 | 12/2/2005 | 12/5/2005 | A | PART |
Dave Hannah
|
|
|
derick; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 10/25/2005 | 10/26/2005 | 10/26/2005 | A | PART |
Mike Jordan
|
|
|
derick; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Shear wall nailing ok. Verified installation of all perimeter holdowns and strapping. Will need engineering for interioir floor to floor holdowns were no wall adove exists for connection.
|
BLD-Foundation | 7/20/2005 | 7/21/2005 | 7/21/2005 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 7/20/2005 at 5:24:57 PM. Contact: ###-####. wip,,,, 80%
|
BLD-Footing | 7/8/2005 | 7/8/2005 | 7/8/2005 | P | PART |
Dave Hannah
|
|
|
derrick ###-#### ok per Jim Wylie for garage footing only//footing pour shall be in compliance with Strata letter dated 7/7/05
|
BLD-Footing | 6/17/2005 | 6/20/2005 | 6/20/2005 | A | PART |
Dave Hannah
|
|
|
###-#### brad//re-bar inspection in storage area please ok to form
|
BLD-Footing | 6/6/2005 | 6/7/2005 | 6/7/2005 | A | PART |
Dave Hannah
|
|
|
brad cooper; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie-- for the underground storage area ok to place concrete for ftgs in storage area
|