Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-00775
StatusFinaled
Name STEED CONSTRUCTION
Site Address 1445 W COMMERCE AVE
Project NameHAYDEN BEVERAGE
Customer Number 
ePlanReviewNo
Description
(HAYDEN BEVERAGE-ADDITION) To construct a one story Type VB 47,307 sq.ft. warehouse/office addition to existing 82,120 sq.ft. unlimited area warehouse/office. Other work inlcudes interior remodeling in the existing warhouse and office areas, all site improvements, paving and landscaping per approved plans and DRH05-00025. Fire sprinklers are used for the unlimited area. This building must maintain 60 foot open yards on all sides. High piled storage requirements are in accordance with the International Fire Code. Separate plans, engineering and permits are required for storage racks over 8 feet in height.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection7/25/20077/25/20077/31/2007 PASS
DetailsJim Storey
DOC - Permit Finaled7/31/20077/31/20077/31/2007PPASS
DetailsJim Storey
BLD-Final4/4/20074/4/20074/4/2007PPASS
DetailsJim Storey
odie; Phone #: ###-#### Internet Inspection Request from: Victoria Beall final ok si achrived.
Code Occupancy Approval4/4/20074/4/20074/4/2007APASS
DetailsDena Gambrel
4-4-07 Final Occupancy sign off. Landscape is in.
Code Occupancy Approval4/4/20074/4/20074/4/2007ACANC
DetailsDena Gambrel
FIRE-Final Inspection3/8/20073/8/20073/8/2007PPASS
DetailsForrest France
Final fire life safety walk through passed inspection, some issues corrected while on site, previous c/n items are complete.
BLD-Aging Inspection3/6/20073/6/20073/6/2007 DEFR
DetailsJim Storey
to plm and fire bond cod still in place but cod permit finaled
BLD-Framing/Rough-in1/2/20071/3/20071/3/2007APASS
DetailsJim Storey
phase 3; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
Code Occupancy Approval Temp11/30/200611/30/200611/30/2006PPASS
DetailsDena Gambrel
Temp sign off. They have installed parking bumpers and In/Out markings. Bonded for the remaining landscaping.
BLD-Aging Inspection10/17/200610/17/200610/17/2006 FAIL
DetailsJim Storey
pending others w/cn idems.
Code Occupancy Approval Temp8/17/20068/17/20068/29/2006AFAIL
DetailsDena Gambrel
08-17-06 Failed inspection. Will need to get bids for in/out marking, parking bumpers and landscape bid for the south part.
FIRE-Final Inspection7/13/20067/14/20067/14/2006AFAIL
DetailsTroy Cobbley
The only life safety items looked at were the exit signs, emergency lights and the exit discharge lights. An exit discharge light is required at the main entry/exit. The overhead sprinkler system needs finaled as well as the fire alarm.
FIRE-Final Inspection7/12/20067/13/20067/13/2006PFAIL
DetailsTroy Cobbley
Life safety is not ready yet since emergency lighting and other permits have not been finaled
BLD-Other7/7/20067/10/20067/10/2006APASS
DetailsJim Storey
ceilling ok need to check spreader bars at final.
BLD-Energy code compliance5/31/20066/1/20066/1/2006APASS
DetailsJim Storey
odie; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in5/31/20066/1/20066/1/2006APASS
DetailsJim Storey
odie; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Aging Inspection5/10/20065/10/20065/11/2006 PASS
DetailsJim Storey
wip
BLD-Final3/10/20063/10/20063/13/2006PCANC
DetailsJim Storey
odie ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
FIRE-Final Inspection3/9/20063/10/20063/10/2006ANR
DetailsForrest France
The project related fire sprinkler and alarm permit work must be finaled prior to life safety final inspection and approval.
Code Occupancy Approval Temp3/8/20063/8/20063/8/2006PFAIL
DetailsDena Gambrel
03-08-06 Bond recieved in the amount of $74, 481.00 for landscape and paving.
BLD-Framing/Rough-in2/7/20062/8/20062/8/2006APART
DetailsJim Storey
ceiling inspection//odie; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa wire hvac termanations.
BLD-Energy code compliance12/21/200512/22/200512/22/2005APART
DetailsJim Storey
odie; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in12/21/200512/22/200512/22/2005APASS
DetailsJim Storey
odie; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Energy code compliance11/16/200511/17/200511/17/2005APART
DetailsTom Arcoraci
odi; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles north south wall at south end of building ok insulation, shear and blocking ok at east center
BLD-Framing/Rough-in11/1/200511/1/200511/1/2005APART
DetailsJim Storey
cooller roof welding ok
BLD-Framing/Rough-in10/31/200510/31/200510/31/2005PPART
DetailsJim Storey
hodie; Phone #: ###-#### Internet Inspection Request from: Cathy Chilesok to cover studwalls need sheer atchment insp.
BLD-Aging Inspection10/3/200510/3/200510/3/2005 PASS
DetailsJim Storey
wip
BLD-Footing8/1/20058/1/20058/1/2005PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/1/2005 at 7:14:45 AM. Contact: ###-####. Placement complete upon arriving on site. Did note that reinforcement and concrete inspected by special inspector.
BLD-Footing7/26/20057/27/20057/27/2005APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/26/2005 at 11:50:13 AM. Contact: ###-####.
FIRE-Conference7/19/20057/20/20057/20/2005ADONE
DetailsForrest France
On site discussion with Pat, the GC for this project, in regards to requirements for automatic smoke and heat vent installation as addressed in plan review notes.
FIRE-Conference7/12/20057/13/20057/13/2005PCANC
DetailsForrest France