BLD-Aging Inspection | 7/25/2007 | 7/25/2007 | 7/31/2007 | | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 7/31/2007 | 7/31/2007 | 7/31/2007 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 4/4/2007 | 4/4/2007 | 4/4/2007 | P | PASS |
Jim Storey
|
|
|
odie; Phone #: ###-#### Internet Inspection Request from: Victoria Beall final ok si achrived.
|
Code Occupancy Approval | 4/4/2007 | 4/4/2007 | 4/4/2007 | A | PASS |
Dena Gambrel
|
|
|
4-4-07 Final Occupancy sign off. Landscape is in.
|
Code Occupancy Approval | 4/4/2007 | 4/4/2007 | 4/4/2007 | A | CANC |
Dena Gambrel
|
|
|
|
FIRE-Final Inspection | 3/8/2007 | 3/8/2007 | 3/8/2007 | P | PASS |
Forrest France
|
|
|
Final fire life safety walk through passed inspection, some issues corrected while on site, previous c/n items are complete.
|
BLD-Aging Inspection | 3/6/2007 | 3/6/2007 | 3/6/2007 | | DEFR |
Jim Storey
|
|
|
to plm and fire bond cod still in place but cod permit finaled
|
BLD-Framing/Rough-in | 1/2/2007 | 1/3/2007 | 1/3/2007 | A | PASS |
Jim Storey
|
|
|
phase 3; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
Code Occupancy Approval Temp | 11/30/2006 | 11/30/2006 | 11/30/2006 | P | PASS |
Dena Gambrel
|
|
|
Temp sign off. They have installed parking bumpers and In/Out markings. Bonded for the remaining landscaping.
|
BLD-Aging Inspection | 10/17/2006 | 10/17/2006 | 10/17/2006 | | FAIL |
Jim Storey
|
|
|
pending others w/cn idems.
|
Code Occupancy Approval Temp | 8/17/2006 | 8/17/2006 | 8/29/2006 | A | FAIL |
Dena Gambrel
|
|
|
08-17-06 Failed inspection. Will need to get bids for in/out marking, parking bumpers and landscape bid for the south part.
|
FIRE-Final Inspection | 7/13/2006 | 7/14/2006 | 7/14/2006 | A | FAIL |
Troy Cobbley
|
|
|
The only life safety items looked at were the exit signs, emergency lights and the exit discharge lights. An exit discharge light is required at the main entry/exit. The overhead sprinkler system needs finaled as well as the fire alarm.
|
FIRE-Final Inspection | 7/12/2006 | 7/13/2006 | 7/13/2006 | P | FAIL |
Troy Cobbley
|
|
|
Life safety is not ready yet since emergency lighting and other permits have not been finaled
|
BLD-Other | 7/7/2006 | 7/10/2006 | 7/10/2006 | A | PASS |
Jim Storey
|
|
|
ceilling ok need to check spreader bars at final.
|
BLD-Energy code compliance | 5/31/2006 | 6/1/2006 | 6/1/2006 | A | PASS |
Jim Storey
|
|
|
odie; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 5/31/2006 | 6/1/2006 | 6/1/2006 | A | PASS |
Jim Storey
|
|
|
odie; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Aging Inspection | 5/10/2006 | 5/10/2006 | 5/11/2006 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Final | 3/10/2006 | 3/10/2006 | 3/13/2006 | P | CANC |
Jim Storey
|
|
|
odie ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
FIRE-Final Inspection | 3/9/2006 | 3/10/2006 | 3/10/2006 | A | NR |
Forrest France
|
|
|
The project related fire sprinkler and alarm permit work must be finaled prior to life safety final inspection and approval.
|
Code Occupancy Approval Temp | 3/8/2006 | 3/8/2006 | 3/8/2006 | P | FAIL |
Dena Gambrel
|
|
|
03-08-06 Bond recieved in the amount of $74, 481.00 for landscape and paving.
|
BLD-Framing/Rough-in | 2/7/2006 | 2/8/2006 | 2/8/2006 | A | PART |
Jim Storey
|
|
|
ceiling inspection//odie; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa wire hvac termanations.
|
BLD-Energy code compliance | 12/21/2005 | 12/22/2005 | 12/22/2005 | A | PART |
Jim Storey
|
|
|
odie; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 12/21/2005 | 12/22/2005 | 12/22/2005 | A | PASS |
Jim Storey
|
|
|
odie; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Energy code compliance | 11/16/2005 | 11/17/2005 | 11/17/2005 | A | PART |
Tom Arcoraci
|
|
|
odi; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles north south wall at south end of building ok insulation, shear and blocking ok at east center
|
BLD-Framing/Rough-in | 11/1/2005 | 11/1/2005 | 11/1/2005 | A | PART |
Jim Storey
|
|
|
cooller roof welding ok
|
BLD-Framing/Rough-in | 10/31/2005 | 10/31/2005 | 10/31/2005 | P | PART |
Jim Storey
|
|
|
hodie; Phone #: ###-#### Internet Inspection Request from: Cathy Chilesok to cover studwalls need sheer atchment insp.
|
BLD-Aging Inspection | 10/3/2005 | 10/3/2005 | 10/3/2005 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Footing | 8/1/2005 | 8/1/2005 | 8/1/2005 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 8/1/2005 at 7:14:45 AM. Contact: ###-####. Placement complete upon arriving on site. Did note that reinforcement and concrete inspected by special inspector.
|
BLD-Footing | 7/26/2005 | 7/27/2005 | 7/27/2005 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 7/26/2005 at 11:50:13 AM. Contact: ###-####.
|
FIRE-Conference | 7/19/2005 | 7/20/2005 | 7/20/2005 | A | DONE |
Forrest France
|
|
|
On site discussion with Pat, the GC for this project, in regards to requirements for automatic smoke and heat vent installation as addressed in plan review notes.
|
FIRE-Conference | 7/12/2005 | 7/13/2005 | 7/13/2005 | P | CANC |
Forrest France
|
|
|
Cancel inspection per Pat the GC, he will re-schedule the confrence at a later date.
|