BLD-Final | 4/7/2006 | 4/10/2006 | 4/10/2006 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 4/7/2006 at 12:59:36 PM. Contact: ###-####.
|
DOC - Permit Finaled | 4/10/2006 | 4/10/2006 | 4/10/2006 | P | PASS |
Jim Storey
|
|
|
|
BLD-Wall cover | 10/5/2005 | 10/7/2005 | 10/7/2005 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Janet Kell
|
BLD-Framing/Rough-in | 9/30/2005 | 10/3/2005 | 10/3/2005 | A | PART |
Jim Storey
|
|
|
###-#### - janet/###-#### - jermine need flood plain cert to planreview/ latteral brace/ sheeblk/ and sheer walls interior.
|
BLD-Framing/Rough-in | 9/30/2005 | 9/30/2005 | 9/30/2005 | P | FAIL |
Mike Jordan
|
|
|
janet; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. need truss eng.
|
BLD-Framing/Rough-in | 9/6/2005 | 9/7/2005 | 9/7/2005 | A | DONE |
Mike Jordan
|
|
|
shear inspection please////janet; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. Shear wall insp. Insp not required, wall bracing responsiblity of contractor. Did verify that all holdowns were in place as per plans and verified nailing patterns on first floor. work appears to be in accordence with approved plans on site.
|
BLD-Foundation | 5/26/2005 | 5/26/2005 | 5/26/2005 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 5/26/2005 at 6:59:01 AM. Contact: ###-####.wip
|
BLD-Footing | 5/20/2005 | 5/20/2005 | 5/20/2005 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/20/2005 at 6:40:01 AM. Contact: ###-####.setbacks ok
|