Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-00801
StatusFinaled
Name STATEWIDE CONSTRUCTION
Site Address 3013 S ABIGAIL WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
"THE PERMIT HOLDER is responsible to comply with current wall bracing requirements as adopted by Boise City." To construct a five bedroom, four and quarter bathroom 4581 sq. ft. two story single family dwelling (2783 sq. ft. first floor/1798 sq. ft. second floor) with a attached 1542 sq. ft. four car garage and a 126 sq. ft. covered front porch. Per approved plans, engineering and requirement list. THIS LOT IS WITHIN THE FLOODPLAIN AREA. A Elevation Certificate is required before calling for a rough framing inspection. (SAM)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/7/20064/10/20064/10/2006PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/7/2006 at 12:59:36 PM. Contact: ###-####.
DOC - Permit Finaled4/10/20064/10/20064/10/2006PPASS
DetailsJim Storey
BLD-Wall cover10/5/200510/7/200510/7/2005PPASS
DetailsJim Storey
Phone #: ###-#### Internet Inspection Request from: Janet Kell
BLD-Framing/Rough-in9/30/200510/3/200510/3/2005APART
DetailsJim Storey
###-#### - janet/###-#### - jermine need flood plain cert to planreview/ latteral brace/ sheeblk/ and sheer walls interior.
BLD-Framing/Rough-in9/30/20059/30/20059/30/2005PFAIL
DetailsMike Jordan
janet; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. need truss eng.
BLD-Framing/Rough-in9/6/20059/7/20059/7/2005ADONE
DetailsMike Jordan
shear inspection please////janet; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. Shear wall insp. Insp not required, wall bracing responsiblity of contractor. Did verify that all holdowns were in place as per plans and verified nailing patterns on first floor. work appears to be in accordence with approved plans on site.
BLD-Foundation5/26/20055/26/20055/26/2005APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/26/2005 at 6:59:01 AM. Contact: ###-####.wip
BLD-Footing5/20/20055/20/20055/20/2005APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/20/2005 at 6:40:01 AM. Contact: ###-####.setbacks ok