Permanent Occupancy | | 4/24/2007 | 4/24/2007 | | DONE |
|
|
|
|
BLD-Aging Inspection | 3/13/2007 | 3/13/2007 | 3/15/2007 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Final | 1/10/2007 | 1/11/2007 | 1/11/2007 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 1/10/2007 at 4:49:22 PM. Contact: ###-####. ok pending others
|
FIRE-Final Inspection | 1/9/2007 | 1/10/2007 | 1/10/2007 | P | PASS |
Forrest France
|
|
|
Fire life safety inspection passed, c/n items are complete.
|
FIRE-Final Inspection | 1/8/2007 | 1/9/2007 | 1/9/2007 | A | FAIL |
Forrest France
|
|
|
Relocate smoke alarms per NFPA 72.
|
BLD-Conference | 1/8/2007 | 1/8/2007 | 1/8/2007 | P | NR |
Tom Arcoraci
|
|
|
derrick - fire life safety ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD-Conference | 11/21/2006 | 11/22/2006 | 11/22/2006 | A | NR |
Mike Jordan
|
|
|
derick; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Need detail from contractor regardig handrail issues. Project is done under IBC and wouold require handrails on either side of stairway with one foot return which if done will encroch on exit passageway at door.
|
BLD-Aging Inspection | 10/23/2006 | 10/23/2006 | 10/23/2006 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 8/21/2006 | 8/21/2006 | 8/21/2006 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 6/20/2006 | 6/20/2006 | 6/20/2006 | P | PASS |
Jim Storey
|
|
|
darek - reinsp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley cn made ok insulation ok
|
BLD-Framing/Rough-in | 6/8/2006 | 6/9/2006 | 6/9/2006 | A | FAIL |
Mike Jordan
|
|
|
derick; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Needs to complete fire caulking at floor/ceiling assemblies. Add strap to top plate at 3rd floor ceiling. Provide two layers of 5/8 " type X around washer box at 3rd floor unit at exterior 1hr. wall aSSEMBLY. ok to insul.
|
BLD-Aging Inspection | 3/23/2006 | 3/23/2006 | 3/23/2006 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 1/18/2006 | 1/18/2006 | 1/18/2006 | | CANC |
Tom Arcoraci
|
|
|
|
BLD-Foundation | 11/16/2005 | 11/17/2005 | 11/17/2005 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/16/2005 at 12:44:31 PM. Contact: ###-####.
|
BLD-Footing | 11/7/2005 | 11/8/2005 | 11/8/2005 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/7/2005 at 3:22:11 PM. Contact: ###-####.
|