BLD-Aging Inspection | 3/3/2008 | 3/3/2008 | 3/3/2008 | | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Expired | 3/3/2008 | 3/3/2008 | 3/3/2008 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 2/15/2007 | 2/16/2007 | 2/16/2007 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/15/2007 at 1:26:11 PM. Contact: ###-####. ok for perm occ
|
FIRE-Final Inspection | 2/15/2007 | 2/16/2007 | 2/16/2007 | A | PASS |
Forrest France
|
|
|
Corrections have been verified for completion, fire life safety inspeciton passed.
|
BLD-Final | 2/14/2007 | 2/15/2007 | 2/15/2007 | A | FAIL |
Dave Hannah
|
|
|
ty; Phone #: ###-#### Internet Inspection Request from: Victoria Beall needs fire sign offs and smoke seals on doors
|
FIRE-Final Inspection | 2/14/2007 | 2/15/2007 | 2/15/2007 | A | FAIL |
Forrest France
|
|
|
Post missing max. occupant load signs at two rooms in the new addition, provide approved hardware at the door to the SE day room as circled on approved plans.
|
FIRE-Final Inspection | 2/14/2007 | 2/14/2007 | 2/15/2007 | P | CANC |
Troy Cobbley
|
|
|
There was no time for inspection. Will need to reschedule.
|
FIRE-Conference | 7/25/2006 | 7/27/2006 | 7/27/2006 | A | DONE |
Forrest France
|
|
|
On site confrence to discuss project related fire alarm, cooking hood, and fire life safety work issues necessary to final BLD permits and establish an occupancy certificate. 60 day timeline for completion established with building manager and contractor.
|
BLD-Framing/Rough-in | 2/2/2006 | 2/3/2006 | 2/3/2006 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/2/2006 at 3:44:26 PM. Contact: ###-####. ceiling grid ok to cover
|
BLD-Conference | 1/31/2006 | 1/31/2006 | 2/1/2006 | P | PASS |
Dave Hannah
|
|
|
harvey -###-####
|
BLD-Framing/Rough-in | 12/22/2005 | 12/23/2005 | 12/23/2005 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/22/2005 at 3:17:22 PM. Contact: ###-####.ceiling in corr ok
|
BLD-Framing/Rough-in | 11/9/2005 | 11/9/2005 | 11/10/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/9/2005 at 10:48:13 AM. Contact: ###-####.lids in corr ok 2hr door needs 90 min grassing and smoke doors need 20 min
|
BLD-Framing/Rough-in | 9/20/2005 | 9/20/2005 | 9/21/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/20/2005 at 9:33:11 AM. Contact: ###-####. mis framing north wing and nurses station ok to cover
|
BLD-Framing/Rough-in | 8/19/2005 | 8/19/2005 | 8/19/2005 | P | PART |
Dave Hannah
|
|
|
harvey ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie fire blocking on backside of corrodor walls
|
BLD-Framing/Rough-in | 8/1/2005 | 8/1/2005 | 8/1/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/1/2005 at 8:41:07 AM. Contact: ###-####. steel studs in game room at entry ok to cover
|