BLD-Final | 5/1/2006 | 5/2/2006 | 5/2/2006 | P | PASS |
Dave Hannah
|
|
|
Kirk; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung ok for perm occ
|
Permanent Occupancy | | 5/2/2006 | 5/2/2006 | | DONE |
|
|
|
|
BLD-Final | 4/20/2006 | 4/21/2006 | 4/24/2006 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung needs to fix lock on front door
|
FIRE-Final Inspection | 4/20/2006 | 4/21/2006 | 4/21/2006 | P | PASS |
Forrest France
|
|
|
Life safety is acceptable.
|
BLD-Other | 2/9/2006 | 2/9/2006 | 2/9/2006 | | DONE |
|
|
|
Temp. Occ. Cert # 5301 extended for 90 days per Jenifer until 5-2-06
|
BLD-Final | 2/3/2006 | 2/6/2006 | 2/7/2006 | A | FAIL |
Dave Hannah
|
|
|
Kirk -- pending fire finals for FIR05-00531 and FIR05-00520; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong still needs fire sign offs
|
BLD-Final | 11/1/2005 | 11/1/2005 | 11/1/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/30/2005 at 8:18:35 PM. Contact: ###-####.ok for temp occ ok for perm after locks on front door are flaged and shell and core are finaled and other trades go perm
|
BLD-Final | 10/30/2005 | 10/31/2005 | 11/1/2005 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/30/2005 at 8:18:35 PM. Contact: ###-####.needs fire signoffs
|
FIRE-Final Inspection | 11/1/2005 | 11/1/2005 | 11/1/2005 | P | PART |
Forrest France
|
|
|
Temp. occupancy approved per D.Hanneman, final pending knox box install and alarm resubmittals for changes from approved drawings.
|
FIRE-Final Inspection | 10/28/2005 | 10/31/2005 | 10/31/2005 | A | FAIL |
Forrest France
|
|
|
Provide knox box and key as required, final pending shell sprinkler and alarm approval.
|
Code Occupancy Approval | 10/26/2005 | 10/26/2005 | 10/26/2005 | P | PASS |
Wm. Michael Meloy
|
|
|
|
BLD-Conference | 10/24/2005 | 10/24/2005 | 10/25/2005 | P | PASS |
Dave Hannah
|
|
|
kirk; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles walked project with contractor for pre final
|
BLD-Final | 10/24/2005 | 10/24/2005 | 10/25/2005 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/24/2005 at 8:03:46 AM. Contact: ###-####.
|
BLD-Final | 9/27/2005 | 9/27/2005 | 9/28/2005 | P | PASS |
Dave Hannah
|
|
|
ceiling grid ok to drop in panals
|
BLD-Framing/Rough-in | 9/26/2005 | 9/27/2005 | 9/27/2005 | A | PART |
Dave Hannah
|
|
|
kirk --celing insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 9/15/2005 | 9/16/2005 | 9/16/2005 | A | PART |
Dave Hannah
|
|
|
kirk Note: ceiling grid; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ceiling grid ok in areas that 7/8 wall angle after all other trades sign off areas that have 3/8 wall angle will be changed to 7/8
|
BLD-Framing/Rough-in | 8/22/2005 | 8/22/2005 | 8/23/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/22/2005 at 7:09:58 AM. Contact: ###-####. ok to cover walls f/r plywood ok and all fire proofing on columns ok
|
BLD-Framing/Rough-in | 8/16/2005 | 8/17/2005 | 8/17/2005 | A | PART |
Dave Hannah
|
|
|
kirk; Phone #: ###-#### Internet Inspection Request from: Barbara Mooreok all but for around coulmns need ta reaply fire proofing also need to finish installing all fire treated ply wood
|