BLD-Final | 10/17/2006 | 10/17/2006 | 10/17/2006 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 10/17/2006 | 10/17/2006 | 10/17/2006 | P | PASS |
Mike Jordan
|
|
|
All letters have been received. Shell and core ok. L of C issued.
|
FIRE-Final Inspection | 10/13/2006 | 10/16/2006 | 10/16/2006 | A | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
BLD-Final | 10/12/2006 | 10/13/2006 | 10/13/2006 | A | PART |
Mike Jordan
|
|
|
odie; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Temp given. Will meet with contractor today to get final aff. letter from special insp. agency and letter from engineer. Life/safety also needs to final.
|
FIRE-Final Inspection | 10/12/2006 | 10/12/2006 | 10/12/2006 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with dave hannimans permission until the knox box is provided.
|
BLD-Conference | 8/29/2006 | 8/29/2006 | 8/29/2006 | P | DONE |
Mike Jordan
|
|
|
Recieved phone call from Dan Stuart in plan review noting that he had a TI for bldg. but shell and core has not yet been finaled or Fire/life/safety. A c/n has been posted.
|
BLD-Aging Inspection | 7/28/2006 | 7/28/2006 | 7/31/2006 | | NR |
Mike Jordan
|
|
|
|
BLD-Aging Inspection | 5/5/2006 | 5/5/2006 | 5/5/2006 | | NR |
Mike Jordan
|
|
|
|
Code Occupancy Approval | 12/6/2005 | 12/6/2005 | 12/6/2005 | P | PASS |
Carol Montgomery
|
|
|
A copy of the landscape plan that was in the packet on site has been delivered to City Hall for file DRH05-00031. Meets compliance. Signed Final
|
Code Occupancy Approval | 12/6/2005 | 12/6/2005 | 12/6/2005 | P | CANC |
Carol Montgomery
|
|
|
Duplicate inspection record
|
BLD-Framing/Rough-in | 9/20/2005 | 9/21/2005 | 9/21/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/20/2005 at 1:49:52 PM. Contact: ###-####. Frame at windows and equipment rm ok
|
BLD-Concrete | 8/1/2005 | 8/2/2005 | 8/2/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/1/2005 at 3:44:49 PM. Contact: ###-####. Approx 5 conc tilt up panels.....OK pending MTI special insp tests and approvals.
|
BLD-Footing | 6/15/2005 | 6/15/2005 | 6/15/2005 | P | PART |
Tom Arcoraci
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles spec insp req
|
BLD-Final | 6/3/2005 | 6/3/2005 | 6/3/2005 | P | DEFR |
Mike Jordan
|
|
|
roof drain inspection///mike; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Needs to call public works or plumbing.
|
BLD-Final | 5/27/2005 | 5/27/2005 | 5/27/2005 | P | DEFR |
Jim Sly
|
|
|
roof drain inspcetion///jim; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa Need Public Works to inspect drainage and seepage pits.
|